Mega Millions
Historic drawing results
Drawing History
| Date | Jackpot | Cash Option | After Taxes | After-Tax Increase |
|---|---|---|---|---|
| 2026-04-21 | $140.0 M | $62.8 M | $39.56 M | $3.02 M (8.26%) |
| 2026-04-17 | $130.0 M | $58.0 M | $36.54 M | $2.84 M (8.41%) |
| 2026-04-14 | $120.0 M | $53.5 M | $33.71 M | $2.71 M (8.76%) |
| 2026-04-10 | $110.0 M | $49.2 M | $31.0 M | $2.84 M (10.08%) |
| 2026-04-07 | $100.0 M | $44.7 M | $28.16 M | $2.9 M (11.47%) |
| 2026-04-03 | $90.0 M | $40.1 M | $25.26 M | $2.83 M (12.63%) |
| 2026-03-31 | $80.0 M | $35.6 M | $22.43 M | $2.59 M (13.03%) |
| 2026-03-27 | $70.0 M | $31.5 M | $19.85 M | $2.84 M (16.7%) |
| 2026-03-24 | $60.0 M | $27.0 M | $17.01 M | $2.77 M (19.47%) |
| 2026-03-20 | $50.0 M | $22.6 M | $14.24 M | - |
| 2026-03-17 | $60.0 M | $27.1 M | $17.07 M | $2.64 M (18.32%) |
| 2026-03-13 | $50.0 M | $22.9 M | $14.43 M | - |
| 2026-03-10 | $533.0 M | $244.2 M | $153.85 M | $7.31 M (4.99%) |
| 2026-03-06 | $496.0 M | $232.6 M | $146.54 M | $6.81 M (4.87%) |
| 2026-03-03 | $473.0 M | $221.8 M | $139.73 M | $5.92 M (4.42%) |
| 2026-02-27 | $458.0 M | $212.4 M | $133.81 M | $5.86 M (4.58%) |
| 2026-02-24 | $438.0 M | $203.1 M | $127.95 M | $6.3 M (5.18%) |
| 2026-02-20 | $416.0 M | $193.1 M | $121.65 M | $6.17 M (5.34%) |
| 2026-02-17 | $395.0 M | $183.3 M | $115.48 M | $5.73 M (5.22%) |
| 2026-02-13 | $385.0 M | $174.2 M | $109.75 M | $5.42 M (5.2%) |
| 2026-02-10 | $366.0 M | $165.6 M | $104.33 M | $5.99 M (6.09%) |
| 2026-02-06 | $346.0 M | $156.1 M | $98.34 M | $6.55 M (7.13%) |
| 2026-02-03 | $323.0 M | $145.7 M | $91.79 M | $5.67 M (6.58%) |
| 2026-01-30 | $303.0 M | $136.7 M | $86.12 M | $5.1 M (6.3%) |
| 2026-01-27 | $285.0 M | $128.6 M | $81.02 M | $4.92 M (6.46%) |
| 2026-01-23 | $266.0 M | $120.8 M | $76.1 M | $4.6 M (6.43%) |
| 2026-01-20 | $250.0 M | $113.5 M | $71.51 M | $5.3 M (8.0%) |
| 2026-01-16 | $230.0 M | $105.1 M | $66.21 M | $4.28 M (6.91%) |
| 2026-01-13 | $215.0 M | $98.3 M | $61.93 M | $4.92 M (8.62%) |
| 2026-01-09 | $199.0 M | $90.5 M | $57.02 M | $5.42 M (10.51%) |
| 2026-01-06 | $180.0 M | $81.9 M | $51.6 M | $6.24 M (13.76%) |
| 2026-01-02 | $157.0 M | $72.0 M | $45.36 M | $5.48 M (13.74%) |
| 2025-12-30 | $138.0 M | $63.3 M | $39.88 M | $4.03 M (11.25%) |
| 2025-12-26 | $125.0 M | $56.9 M | $35.85 M | $7.19 M (25.07%) |
| 2025-12-23 | $100.0 M | $45.5 M | $28.67 M | $2.97 M (11.54%) |
| 2025-12-19 | $90.0 M | $40.8 M | $25.7 M | $2.89 M (12.69%) |
| 2025-12-16 | $80.0 M | $36.2 M | $22.81 M | $2.65 M (13.14%) |
| 2025-12-12 | $70.0 M | $32.0 M | $20.16 M | $2.9 M (16.79%) |
| 2025-12-09 | $60.0 M | $27.4 M | $17.26 M | $2.58 M (17.58%) |
| 2025-12-05 | $50.0 M | $23.3 M | $14.68 M | - |
| 2025-12-02 | $90.0 M | $41.9 M | $26.4 M | $3.15 M (13.56%) |
| 2025-11-28 | $80.0 M | $36.9 M | $23.25 M | $2.9 M (14.26%) |
| 2025-11-25 | $70.0 M | $32.3 M | $20.35 M | $2.9 M (16.61%) |
| 2025-11-21 | $60.0 M | $27.7 M | $17.45 M | $2.83 M (19.39%) |
| 2025-11-18 | $50.0 M | $23.2 M | $14.62 M | - |
| 2025-11-14 | $980.0 M | $452.2 M | $284.89 M | $23.25 M (8.89%) |
| 2025-11-11 | $900.0 M | $415.3 M | $261.64 M | $14.87 M (6.03%) |
| 2025-11-07 | $843.0 M | $391.7 M | $246.77 M | $12.6 M (5.38%) |
| 2025-11-04 | $800.0 M | $371.7 M | $234.17 M | $11.91 M (5.36%) |
| 2025-10-31 | $754.0 M | $352.8 M | $222.26 M | $11.78 M (5.6%) |
| 2025-10-28 | $714.0 M | $334.1 M | $210.48 M | $10.01 M (5.0%) |
| 2025-10-24 | $680.0 M | $318.2 M | $200.47 M | $8.89 M (4.64%) |
| 2025-10-21 | $650.0 M | $304.1 M | $191.58 M | $9.64 M (5.3%) |
| 2025-10-17 | $625.0 M | $288.8 M | $181.94 M | $7.3 M (4.18%) |
| 2025-10-14 | $600.0 M | $277.2 M | $174.64 M | $7.94 M (4.76%) |
| 2025-10-10 | $575.0 M | $264.6 M | $166.7 M | $8.13 M (5.13%) |
| 2025-10-07 | $547.0 M | $251.7 M | $158.57 M | $7.31 M (4.83%) |
| 2025-10-03 | $520.0 M | $240.1 M | $151.26 M | $6.68 M (4.62%) |
| 2025-09-30 | $497.0 M | $229.5 M | $144.59 M | $6.37 M (4.61%) |
| 2025-09-26 | $474.0 M | $219.4 M | $138.22 M | $6.74 M (5.13%) |
| 2025-09-23 | $451.0 M | $208.7 M | $131.48 M | $7.69 M (6.21%) |
| 2025-09-19 | $423.0 M | $196.5 M | $123.8 M | $6.75 M (5.76%) |
| 2025-09-16 | $400.0 M | $185.8 M | $117.05 M | $6.8 M (6.17%) |
| 2025-09-12 | $381.0 M | $175.0 M | $110.25 M | $6.62 M (6.38%) |
| 2025-09-09 | $358.0 M | $164.5 M | $103.64 M | $8.32 M (8.73%) |
| 2025-09-05 | $336.0 M | $151.3 M | $95.32 M | $9.64 M (11.25%) |
| 2025-09-02 | $302.0 M | $136.0 M | $85.68 M | $7.18 M (9.15%) |
| 2025-08-29 | $277.0 M | $124.6 M | $78.5 M | $6.81 M (9.49%) |
| 2025-08-26 | $253.0 M | $113.8 M | $71.69 M | $5.48 M (8.27%) |
| 2025-08-22 | $234.0 M | $105.1 M | $66.21 M | $5.1 M (8.35%) |
| 2025-08-19 | $216.0 M | $97.0 M | $61.11 M | $4.85 M (8.62%) |
| 2025-08-15 | $198.0 M | $89.3 M | $56.26 M | $4.54 M (8.77%) |
| 2025-08-12 | $182.0 M | $82.1 M | $51.72 M | $4.34 M (9.17%) |
| 2025-08-08 | $166.0 M | $75.2 M | $47.38 M | $4.6 M (10.76%) |
| 2025-08-05 | $150.0 M | $67.9 M | $42.78 M | $3.72 M (9.52%) |
| 2025-08-01 | $140.0 M | $62.0 M | $39.06 M | $2.84 M (7.83%) |
| 2025-07-29 | $130.0 M | $57.5 M | $36.23 M | $2.97 M (8.92%) |
| 2025-07-25 | $120.0 M | $52.8 M | $33.26 M | $2.77 M (9.08%) |
| 2025-07-22 | $110.0 M | $48.4 M | $30.49 M | $2.58 M (9.25%) |
| 2025-07-18 | $100.0 M | $44.3 M | $27.91 M | $2.77 M (11.03%) |
| 2025-07-15 | $90.0 M | $39.9 M | $25.14 M | $2.59 M (11.47%) |
| 2025-07-11 | $80.0 M | $35.8 M | $22.55 M | $2.83 M (14.36%) |
| 2025-07-08 | $70.0 M | $31.3 M | $19.72 M | $2.77 M (16.36%) |
| 2025-07-04 | $60.0 M | $26.9 M | $16.95 M | $2.84 M (20.11%) |
| 2025-07-01 | $50.0 M | $22.4 M | $14.11 M | - |
| 2025-06-27 | $348.0 M | $155.5 M | $97.97 M | $6.18 M (6.73%) |
| 2025-06-24 | $326.0 M | $145.7 M | $91.79 M | $6.11 M (7.13%) |
| 2025-06-20 | $302.0 M | $136.0 M | $85.68 M | $6.24 M (7.85%) |
| 2025-06-17 | $280.0 M | $126.1 M | $79.44 M | $5.54 M (7.5%) |
| 2025-06-13 | $264.0 M | $117.3 M | $73.9 M | $5.86 M (8.61%) |
| 2025-06-10 | $243.0 M | $108.0 M | $68.04 M | $5.42 M (8.65%) |
| 2025-06-06 | $223.0 M | $99.4 M | $62.62 M | $5.92 M (10.44%) |
| 2025-06-03 | $202.0 M | $90.0 M | $56.7 M | $4.6 M (8.83%) |
| 2025-05-30 | $189.0 M | $82.7 M | $52.1 M | $4.41 M (9.24%) |
| 2025-05-27 | $173.0 M | $75.7 M | $47.69 M | $4.22 M (9.71%) |
| 2025-05-23 | $154.0 M | $69.0 M | $43.47 M | $4.22 M (10.75%) |
| 2025-05-20 | $139.0 M | $62.3 M | $39.25 M | $4.73 M (13.69%) |
| 2025-05-16 | $122.0 M | $54.8 M | $34.52 M | $3.4 M (10.92%) |
| 2025-05-13 | $110.0 M | $49.4 M | $31.12 M | $2.58 M (9.04%) |
| 2025-05-09 | $100.0 M | $45.3 M | $28.54 M | $2.84 M (11.03%) |
| 2025-05-06 | $90.0 M | $40.8 M | $25.7 M | $2.77 M (12.07%) |
| 2025-05-02 | $80.0 M | $36.4 M | $22.93 M | $2.9 M (14.46%) |
| 2025-04-29 | $70.0 M | $31.8 M | $20.03 M | $3.08 M (18.19%) |
| 2025-04-25 | $60.0 M | $26.9 M | $16.95 M | $2.84 M (20.11%) |
| 2025-04-22 | $50.0 M | $22.4 M | $14.11 M | - |
| 2025-04-18 | $112.0 M | $49.3 M | $31.06 M | $4.47 M (16.83%) |
| 2025-04-15 | $96.0 M | $42.2 M | $26.59 M | $4.98 M (23.05%) |
| 2025-04-11 | $72.0 M | $34.3 M | $21.61 M | $5.42 M (33.47%) |
| 2025-04-08 | $54.0 M | $25.7 M | $16.19 M | $3.28 M (25.36%) |
| 2025-04-04 | $43.0 M | $20.5 M | $12.92 M | $4.42 M (51.91%) |
| 2025-04-01 | $29.0 M | $13.5 M | $8.51 M | $2.71 M (46.83%) |
| 2025-03-28 | $20.0 M | $9.2 M | $5.8 M | - |
| 2025-03-25 | $344.0 M | $159.1 M | $100.23 M | $4.41 M (4.6%) |
| 2025-03-21 | $324.0 M | $152.1 M | $95.82 M | $7.62 M (8.64%) |
| 2025-03-18 | $301.0 M | $140.0 M | $88.2 M | $7.31 M (9.03%) |
| 2025-03-14 | $277.0 M | $128.4 M | $80.89 M | $5.48 M (7.27%) |
| 2025-03-11 | $256.0 M | $119.7 M | $75.41 M | $6.87 M (10.02%) |
| 2025-03-07 | $233.0 M | $108.8 M | $68.54 M | $4.34 M (6.77%) |
| 2025-03-04 | $215.0 M | $101.9 M | $64.2 M | $5.99 M (10.29%) |
| 2025-02-28 | $197.0 M | $92.4 M | $58.21 M | $4.98 M (9.35%) |
| 2025-02-25 | $181.0 M | $84.5 M | $53.24 M | $5.74 M (12.08%) |
| 2025-02-21 | $165.0 M | $75.4 M | $47.5 M | $5.98 M (14.41%) |
| 2025-02-18 | $145.0 M | $65.9 M | $41.52 M | $4.35 M (11.7%) |
| 2025-02-14 | $129.0 M | $59.0 M | $37.17 M | $5.67 M (18.0%) |
| 2025-02-11 | $110.0 M | $50.0 M | $31.5 M | $4.47 M (16.55%) |
| 2025-02-07 | $94.0 M | $42.9 M | $27.03 M | $5.23 M (24.0%) |
| 2025-02-04 | $77.0 M | $34.6 M | $21.8 M | $5.04 M (30.09%) |
| 2025-01-31 | $59.0 M | $26.6 M | $16.76 M | $4.29 M (34.36%) |
| 2025-01-28 | $44.0 M | $19.8 M | $12.47 M | $4.66 M (59.63%) |
| 2025-01-24 | $28.0 M | $12.4 M | $7.81 M | $2.2 M (39.29%) |
| 2025-01-21 | $20.0 M | $8.9 M | $5.61 M | - |
| 2025-01-17 | $113.0 M | $50.4 M | $31.75 M | $5.73 M (22.03%) |
| 2025-01-14 | $95.0 M | $41.3 M | $26.02 M | $4.79 M (22.56%) |
| 2025-01-10 | $77.0 M | $33.7 M | $21.23 M | $3.97 M (22.99%) |
| 2025-01-07 | $62.0 M | $27.4 M | $17.26 M | $5.42 M (45.73%) |
| 2025-01-03 | $42.0 M | $18.8 M | $11.84 M | $6.17 M (108.82%) |
| 2024-12-31 | $20.0 M | $9.0 M | $5.67 M | - |
| 2024-12-27 | $1220.0 M | $549.7 M | $346.31 M | $63.57 M (22.48%) |
| 2024-12-24 | $1000.0 M | $448.8 M | $282.74 M | $35.72 M (14.46%) |
| 2024-12-20 | $862.0 M | $392.1 M | $247.02 M | $25.2 M (11.36%) |
| 2024-12-17 | $760.0 M | $352.1 M | $221.82 M | $18.96 M (9.35%) |
| 2024-12-13 | $695.0 M | $322.0 M | $202.86 M | $17.89 M (9.67%) |
| 2024-12-10 | $619.0 M | $293.6 M | $184.97 M | $9.58 M (5.46%) |
| 2024-12-06 | $579.0 M | $278.4 M | $175.39 M | $12.6 M (7.74%) |
| 2024-12-03 | $541.0 M | $258.4 M | $162.79 M | $8.63 M (5.6%) |
| 2024-11-29 | $514.0 M | $244.7 M | $154.16 M | $9.7 M (6.72%) |
| 2024-11-26 | $489.0 M | $229.3 M | $144.46 M | $12.98 M (9.87%) |
| 2024-11-22 | $453.0 M | $208.7 M | $131.48 M | $10.71 M (8.87%) |
| 2024-11-19 | $420.0 M | $191.7 M | $120.77 M | $9.45 M (8.49%) |
| 2024-11-15 | $387.0 M | $176.7 M | $111.32 M | $4.72 M (4.43%) |
| 2024-11-12 | $361.0 M | $169.2 M | $106.6 M | $8.01 M (8.12%) |
| 2024-11-08 | $334.0 M | $156.5 M | $98.6 M | $9.27 M (10.37%) |
| 2024-11-05 | $303.0 M | $141.8 M | $89.33 M | $6.49 M (7.83%) |
| 2024-11-01 | $281.0 M | $131.5 M | $82.85 M | $10.09 M (13.86%) |
| 2024-10-29 | $250.0 M | $115.5 M | $72.77 M | $5.05 M (7.45%) |
| 2024-10-25 | $229.0 M | $107.5 M | $67.73 M | $7.19 M (11.87%) |
| 2024-10-22 | $205.0 M | $96.1 M | $60.54 M | $5.1 M (9.2%) |
| 2024-10-18 | $185.0 M | $88.0 M | $55.44 M | $4.6 M (9.05%) |
| 2024-10-15 | $169.0 M | $80.7 M | $50.84 M | $6.11 M (13.66%) |
| 2024-10-11 | $150.0 M | $71.0 M | $44.73 M | $5.99 M (15.45%) |
| 2024-10-08 | $129.0 M | $61.5 M | $38.75 M | $5.86 M (17.83%) |
| 2024-10-04 | $108.0 M | $52.2 M | $32.89 M | $3.66 M (12.51%) |
| 2024-10-01 | $93.0 M | $46.4 M | $29.23 M | $4.98 M (20.51%) |
| 2024-09-27 | $77.0 M | $38.5 M | $24.26 M | $4.86 M (25.03%) |
| 2024-09-24 | $62.0 M | $30.8 M | $19.4 M | $4.6 M (31.04%) |
| 2024-09-20 | $47.0 M | $23.5 M | $14.81 M | $4.86 M (48.78%) |
| 2024-09-17 | $31.0 M | $15.8 M | $9.95 M | $3.59 M (56.37%) |
| 2024-09-13 | $20.0 M | $10.1 M | $6.36 M | - |
| 2024-09-10 | $800.0 M | $404.2 M | $254.65 M | $20.54 M (8.77%) |
| 2024-09-06 | $740.0 M | $371.6 M | $234.11 M | $21.74 M (10.24%) |
| 2024-09-03 | $681.0 M | $337.1 M | $212.37 M | $17.45 M (8.95%) |
| 2024-08-30 | $627.0 M | $309.4 M | $194.92 M | $14.17 M (7.84%) |
| 2024-08-27 | $582.0 M | $286.9 M | $180.75 M | $13.42 M (8.02%) |
| 2024-08-23 | $535.0 M | $265.6 M | $167.33 M | $11.41 M (7.31%) |
| 2024-08-20 | $498.0 M | $247.5 M | $155.93 M | $11.98 M (8.32%) |
| 2024-08-16 | $464.0 M | $228.5 M | $143.96 M | $9.2 M (6.83%) |
| 2024-08-13 | $435.0 M | $213.9 M | $134.76 M | $10.21 M (8.2%) |
| 2024-08-09 | $405.0 M | $197.7 M | $124.55 M | $7.43 M (6.35%) |
| 2024-08-06 | $374.0 M | $185.9 M | $117.12 M | $6.24 M (5.63%) |
| 2024-08-02 | $358.0 M | $176.0 M | $110.88 M | $12.03 M (12.17%) |
| 2024-07-30 | $331.0 M | $156.9 M | $98.85 M | $7.88 M (8.66%) |
| 2024-07-26 | $306.0 M | $144.4 M | $90.97 M | $8.38 M (10.14%) |
| 2024-07-23 | $279.0 M | $131.1 M | $82.59 M | $8.25 M (11.1%) |
| 2024-07-19 | $251.0 M | $118.0 M | $74.34 M | $6.99 M (10.38%) |
| 2024-07-16 | $226.0 M | $106.9 M | $67.35 M | $6.87 M (11.36%) |
| 2024-07-12 | $203.0 M | $96.0 M | $60.48 M | $7.18 M (13.48%) |
| 2024-07-09 | $181.0 M | $84.6 M | $53.3 M | $5.74 M (12.06%) |
| 2024-07-05 | $162.0 M | $75.5 M | $47.57 M | $7.88 M (19.85%) |
| 2024-07-02 | $137.0 M | $63.0 M | $39.69 M | $4.91 M (14.13%) |
| 2024-06-28 | $116.0 M | $55.2 M | $34.78 M | $5.55 M (18.98%) |
| 2024-06-25 | $97.0 M | $46.4 M | $29.23 M | $5.1 M (21.14%) |
| 2024-06-21 | $80.0 M | $38.3 M | $24.13 M | $5.8 M (31.62%) |
| 2024-06-18 | $61.0 M | $29.1 M | $18.33 M | $4.09 M (28.74%) |
| 2024-06-14 | $47.0 M | $22.6 M | $14.24 M | $5.48 M (62.61%) |
| 2024-06-11 | $30.0 M | $13.9 M | $8.76 M | $2.9 M (49.51%) |
| 2024-06-07 | $20.0 M | $9.3 M | $5.86 M | - |
| 2024-06-04 | $560.0 M | $264.0 M | $166.32 M | $14.62 M (9.63%) |
| 2024-05-31 | $522.0 M | $240.8 M | $151.7 M | $9.26 M (6.5%) |
| 2024-05-28 | $489.0 M | $226.1 M | $142.44 M | $10.27 M (7.77%) |
| 2024-05-24 | $453.0 M | $209.8 M | $132.17 M | $8.44 M (6.82%) |
| 2024-05-21 | $421.0 M | $196.4 M | $123.73 M | $8.5 M (7.38%) |
| 2024-05-17 | $393.0 M | $182.9 M | $115.23 M | $9.64 M (9.13%) |
| 2024-05-14 | $363.0 M | $167.6 M | $105.59 M | $9.14 M (9.47%) |
| 2024-05-10 | $331.0 M | $153.1 M | $96.45 M | $7.24 M (8.12%) |
| 2024-05-07 | $306.0 M | $141.6 M | $89.21 M | $7.31 M (8.93%) |
| 2024-05-03 | $284.0 M | $130.0 M | $81.9 M | $9.14 M (12.55%) |
| 2024-04-30 | $257.0 M | $115.5 M | $72.77 M | $8.2 M (12.69%) |
| 2024-04-26 | $228.0 M | $102.5 M | $64.58 M | $6.87 M (11.91%) |
| 2024-04-23 | $202.0 M | $91.6 M | $57.71 M | $7.06 M (13.93%) |
| 2024-04-19 | $178.0 M | $80.4 M | $50.65 M | $9.01 M (21.63%) |
| 2024-04-16 | $148.0 M | $66.1 M | $41.64 M | $5.54 M (15.35%) |
| 2024-04-12 | $125.0 M | $57.3 M | $36.1 M | $7.69 M (27.05%) |
| 2024-04-09 | $97.0 M | $45.1 M | $28.41 M | $8.82 M (45.0%) |
| 2024-04-05 | $67.0 M | $31.1 M | $19.59 M | $6.49 M (49.5%) |
| 2024-04-02 | $45.0 M | $20.8 M | $13.1 M | $7.12 M (118.88%) |
| 2024-03-29 | $20.0 M | $9.5 M | $5.99 M | - |
| 2024-03-26 | $1130.0 M | $537.5 M | $338.63 M | $44.42 M (15.1%) |
| 2024-03-22 | $977.0 M | $467.0 M | $294.21 M | $28.73 M (10.82%) |
| 2024-03-19 | $893.0 M | $421.4 M | $265.48 M | $22.87 M (9.43%) |
| 2024-03-15 | $815.0 M | $385.1 M | $242.61 M | $19.4 M (8.69%) |
| 2024-03-12 | $735.0 M | $354.3 M | $223.21 M | $13.17 M (6.27%) |
| 2024-03-08 | $687.0 M | $333.4 M | $210.04 M | $11.97 M (6.04%) |
| 2024-03-05 | $650.0 M | $314.4 M | $198.07 M | $16.5 M (9.09%) |
| 2024-03-01 | $607.0 M | $288.2 M | $181.57 M | $13.93 M (8.31%) |
| 2024-02-27 | $563.0 M | $266.1 M | $167.64 M | $11.72 M (7.51%) |
| 2024-02-23 | $525.0 M | $247.5 M | $155.93 M | $9.71 M (6.64%) |
| 2024-02-20 | $493.0 M | $232.1 M | $146.22 M | $11.27 M (8.35%) |
| 2024-02-16 | $457.0 M | $214.2 M | $134.95 M | $7.88 M (6.2%) |
| 2024-02-13 | $425.0 M | $201.7 M | $127.07 M | $9.07 M (7.69%) |
| 2024-02-09 | $394.0 M | $187.3 M | $118.0 M | $8.0 M (7.27%) |
| 2024-02-06 | $365.0 M | $174.6 M | $110.0 M | $7.88 M (7.71%) |
| 2024-02-02 | $333.0 M | $162.1 M | $102.12 M | $7.94 M (8.42%) |
| 2024-01-30 | $311.0 M | $149.5 M | $94.19 M | $9.33 M (10.99%) |
| 2024-01-26 | $285.0 M | $134.7 M | $84.86 M | $7.06 M (9.07%) |
| 2024-01-23 | $262.0 M | $123.5 M | $77.81 M | $7.69 M (10.97%) |
| 2024-01-19 | $236.0 M | $111.3 M | $70.12 M | $7.06 M (11.19%) |
| 2024-01-16 | $208.0 M | $100.1 M | $63.06 M | $5.54 M (9.63%) |
| 2024-01-12 | $187.0 M | $91.3 M | $57.52 M | $6.93 M (13.7%) |
| 2024-01-09 | $165.0 M | $80.3 M | $50.59 M | $7.88 M (18.44%) |
| 2024-01-05 | $140.0 M | $67.8 M | $42.71 M | $7.37 M (20.84%) |
| 2024-01-02 | $114.0 M | $56.1 M | $35.34 M | $6.3 M (21.68%) |
| 2023-12-29 | $92.0 M | $46.1 M | $29.04 M | $6.11 M (26.64%) |
| 2023-12-26 | $73.0 M | $36.4 M | $22.93 M | $4.98 M (27.71%) |
| 2023-12-22 | $57.0 M | $28.5 M | $17.96 M | $5.11 M (39.74%) |
| 2023-12-19 | $41.0 M | $20.4 M | $12.85 M | $4.09 M (46.74%) |
| 2023-12-15 | $28.0 M | $13.9 M | $8.76 M | $2.78 M (46.37%) |
| 2023-12-12 | $20.0 M | $9.5 M | $5.99 M | - |
| 2023-12-08 | $395.0 M | $189.0 M | $119.07 M | $5.92 M (5.23%) |
| 2023-12-05 | $377.0 M | $179.6 M | $113.15 M | $9.14 M (8.78%) |
| 2023-12-01 | $355.0 M | $165.1 M | $104.01 M | $6.49 M (6.65%) |
| 2023-11-28 | $335.0 M | $154.8 M | $97.52 M | $8.82 M (9.94%) |
| 2023-11-24 | $308.0 M | $140.8 M | $88.7 M | $4.72 M (5.62%) |
| 2023-11-21 | $289.0 M | $133.3 M | $83.98 M | $7.18 M (9.35%) |
| 2023-11-17 | $267.0 M | $121.9 M | $76.8 M | $6.24 M (8.84%) |
| 2023-11-14 | $245.0 M | $112.0 M | $70.56 M | $7.06 M (11.11%) |
| 2023-11-10 | $223.0 M | $100.8 M | $63.5 M | $7.37 M (13.12%) |
| 2023-11-07 | $196.0 M | $89.1 M | $56.13 M | $6.23 M (12.49%) |
| 2023-11-03 | $181.0 M | $79.2 M | $49.9 M | $6.18 M (14.13%) |
| 2023-10-31 | $159.0 M | $69.4 M | $43.72 M | $6.17 M (16.44%) |
| 2023-10-27 | $137.0 M | $59.6 M | $37.55 M | $6.62 M (21.39%) |
| 2023-10-24 | $114.0 M | $49.1 M | $30.93 M | $5.92 M (23.67%) |
| 2023-10-20 | $91.0 M | $39.7 M | $25.01 M | $5.42 M (27.65%) |
| 2023-10-17 | $69.0 M | $31.1 M | $19.59 M | $6.23 M (46.68%) |
| 2023-10-13 | $48.0 M | $21.2 M | $13.36 M | $7.88 M (143.75%) |
| 2023-10-10 | $20.0 M | $8.7 M | $5.48 M | - |
| 2023-10-06 | $360.0 M | $156.9 M | $98.85 M | $10.46 M (11.84%) |
| 2023-10-03 | $315.0 M | $140.3 M | $88.39 M | $10.52 M (13.51%) |
| 2023-09-29 | $267.0 M | $123.6 M | $77.87 M | $9.96 M (14.66%) |
| 2023-09-26 | $230.0 M | $107.8 M | $67.91 M | $6.11 M (9.88%) |
| 2023-09-22 | $205.0 M | $98.1 M | $61.8 M | $6.74 M (12.24%) |
| 2023-09-19 | $183.0 M | $87.4 M | $55.06 M | $6.05 M (12.34%) |
| 2023-09-15 | $162.0 M | $77.8 M | $49.01 M | $5.98 M (13.9%) |
| 2023-09-12 | $141.0 M | $68.3 M | $43.03 M | $6.05 M (16.36%) |
| 2023-09-08 | $122.0 M | $58.7 M | $36.98 M | $6.05 M (19.55%) |
| 2023-09-05 | $101.0 M | $49.1 M | $30.93 M | $4.97 M (19.16%) |
| 2023-09-01 | $85.0 M | $41.2 M | $25.96 M | $5.61 M (27.57%) |
| 2023-08-29 | $67.0 M | $32.3 M | $20.35 M | $4.85 M (31.31%) |
| 2023-08-25 | $52.0 M | $24.6 M | $15.5 M | $5.55 M (55.72%) |
| 2023-08-22 | $33.0 M | $15.8 M | $9.95 M | $3.9 M (64.52%) |
| 2023-08-18 | $20.0 M | $9.6 M | $6.05 M | - |
| 2023-08-15 | $36.0 M | $17.5 M | $11.03 M | $4.79 M (76.85%) |
| 2023-08-11 | $20.0 M | $9.9 M | $6.24 M | - |
| 2023-08-08 | $1580.0 M | $783.3 M | $493.48 M | $78.0 M (18.77%) |
| 2023-08-04 | $1350.0 M | $659.5 M | $415.49 M | $82.91 M (24.93%) |
| 2023-08-01 | $1050.0 M | $527.9 M | $332.58 M | $34.91 M (11.73%) |
| 2023-07-28 | $940.0 M | $472.5 M | $297.68 M | $31.82 M (11.97%) |
| 2023-07-25 | $820.0 M | $422.0 M | $265.86 M | $33.01 M (14.18%) |
| 2023-07-21 | $720.0 M | $369.6 M | $232.85 M | $26.21 M (12.68%) |
| 2023-07-18 | $640.0 M | $328.0 M | $206.64 M | $29.55 M (16.68%) |
| 2023-07-14 | $560.0 M | $281.1 M | $177.09 M | $18.96 M (11.99%) |
| 2023-07-11 | $500.0 M | $251.0 M | $158.13 M | $16.0 M (11.26%) |
| 2023-07-07 | $450.0 M | $225.6 M | $142.13 M | $12.98 M (10.05%) |
| 2023-07-04 | $400.0 M | $205.0 M | $129.15 M | $7.31 M (6.0%) |
| 2023-06-30 | $368.0 M | $193.4 M | $121.84 M | $8.38 M (7.38%) |
| 2023-06-27 | $343.0 M | $180.1 M | $113.46 M | $7.81 M (7.39%) |
| 2023-06-23 | $320.0 M | $167.7 M | $105.65 M | $7.37 M (7.5%) |
| 2023-06-20 | $300.0 M | $156.0 M | $98.28 M | $6.8 M (7.44%) |
| 2023-06-16 | $281.0 M | $145.2 M | $91.48 M | $6.87 M (8.12%) |
| 2023-06-13 | $260.0 M | $134.3 M | $84.61 M | $6.24 M (7.96%) |
| 2023-06-09 | $240.0 M | $124.4 M | $78.37 M | $6.68 M (9.31%) |
| 2023-06-06 | $218.0 M | $113.8 M | $71.69 M | $5.79 M (8.79%) |
| 2023-06-02 | $203.0 M | $104.6 M | $65.9 M | $5.86 M (9.76%) |
| 2023-05-30 | $187.0 M | $95.3 M | $60.04 M | $5.61 M (10.3%) |
| 2023-05-26 | $169.0 M | $86.4 M | $54.43 M | $5.79 M (11.91%) |
| 2023-05-23 | $150.0 M | $77.2 M | $48.64 M | $5.3 M (12.22%) |
| 2023-05-19 | $132.0 M | $68.8 M | $43.34 M | $5.35 M (14.09%) |
| 2023-05-16 | $113.0 M | $60.3 M | $37.99 M | $5.17 M (15.74%) |
| 2023-05-12 | $99.0 M | $52.1 M | $32.82 M | $5.16 M (18.67%) |
| 2023-05-09 | $83.0 M | $43.9 M | $27.66 M | $5.11 M (22.64%) |
| 2023-05-05 | $68.0 M | $35.8 M | $22.55 M | $5.1 M (29.22%) |
| 2023-05-02 | $52.0 M | $27.7 M | $17.45 M | $4.6 M (35.78%) |
| 2023-04-28 | $38.0 M | $20.4 M | $12.85 M | $4.22 M (48.88%) |
| 2023-04-25 | $26.0 M | $13.7 M | $8.63 M | $2.02 M (30.46%) |
| 2023-04-21 | $20.0 M | $10.5 M | $6.62 M | $-0.06 M (-0.87%) |
| 2023-04-18 | $20.0 M | $10.6 M | $6.68 M | - |
| 2023-04-14 | $476.0 M | $256.0 M | $161.28 M | $10.84 M (7.2%) |
| 2023-04-11 | $441.0 M | $238.8 M | $150.44 M | $11.21 M (8.05%) |
| 2023-04-07 | $414.0 M | $221.0 M | $139.23 M | $10.84 M (8.44%) |
| 2023-04-04 | $385.0 M | $203.8 M | $128.39 M | $10.2 M (8.63%) |
| 2023-03-31 | $355.0 M | $187.6 M | $118.19 M | $8.38 M (7.63%) |
| 2023-03-28 | $322.0 M | $174.3 M | $109.81 M | $9.14 M (9.07%) |
| 2023-03-24 | $302.0 M | $159.8 M | $100.67 M | $8.38 M (9.07%) |
| 2023-03-21 | $272.0 M | $146.5 M | $92.3 M | $8.07 M (9.58%) |
| 2023-03-17 | $254.0 M | $133.7 M | $84.23 M | $8.25 M (10.86%) |
| 2023-03-14 | $229.0 M | $120.6 M | $75.98 M | $8.51 M (12.61%) |
| 2023-03-10 | $203.0 M | $107.1 M | $67.47 M | $7.18 M (11.91%) |
| 2023-03-07 | $188.0 M | $95.7 M | $60.29 M | $7.06 M (13.25%) |
| 2023-03-03 | $167.0 M | $84.5 M | $53.24 M | $6.43 M (13.74%) |
| 2023-02-28 | $145.0 M | $74.3 M | $46.81 M | $6.55 M (16.28%) |
| 2023-02-24 | $126.0 M | $63.9 M | $40.26 M | $6.81 M (20.35%) |
| 2023-02-21 | $104.0 M | $53.1 M | $33.45 M | $5.73 M (20.67%) |
| 2023-02-17 | $84.0 M | $44.0 M | $27.72 M | $5.61 M (25.36%) |
| 2023-02-14 | $67.0 M | $35.1 M | $22.11 M | $5.48 M (32.94%) |
| 2023-02-10 | $50.0 M | $26.4 M | $16.63 M | $6.17 M (59.02%) |
| 2023-02-07 | $31.0 M | $16.6 M | $10.46 M | $3.78 M (56.63%) |
| 2023-02-03 | $20.0 M | $10.6 M | $6.68 M | - |
| 2023-01-31 | $31.0 M | $16.5 M | $10.4 M | $3.79 M (57.22%) |
| 2023-01-27 | $20.0 M | $10.5 M | $6.62 M | - |
| 2023-01-24 | $31.0 M | $16.5 M | $10.4 M | $3.72 M (55.74%) |
| 2023-01-20 | $20.0 M | $10.6 M | $6.68 M | $-0.06 M (-0.9%) |
| 2023-01-17 | $20.0 M | $10.7 M | $6.74 M | - |
| 2023-01-13 | $1350.0 M | $724.6 M | $456.5 M | $93.12 M (25.62%) |
| 2023-01-10 | $1100.0 M | $576.8 M | $363.38 M | $58.78 M (19.3%) |
| 2023-01-06 | $940.0 M | $483.5 M | $304.61 M | $55.76 M (22.41%) |
| 2023-01-03 | $785.0 M | $395.0 M | $248.85 M | $29.74 M (13.57%) |
| 2022-12-30 | $685.0 M | $347.8 M | $219.11 M | $34.14 M (18.46%) |
| 2022-12-27 | $565.0 M | $293.6 M | $184.97 M | $16.89 M (10.05%) |
| 2022-12-23 | $510.0 M | $266.8 M | $168.08 M | $10.33 M (6.55%) |
| 2022-12-20 | $465.0 M | $250.4 M | $157.75 M | $10.58 M (7.19%) |
| 2022-12-16 | $429.0 M | $233.6 M | $147.17 M | $10.96 M (8.05%) |
| 2022-12-13 | $400.0 M | $216.2 M | $136.21 M | $8.57 M (6.72%) |
| 2022-12-09 | $379.0 M | $202.6 M | $127.64 M | $9.89 M (8.4%) |
| 2022-12-06 | $354.0 M | $186.9 M | $117.75 M | $9.2 M (8.48%) |
| 2022-12-02 | $333.0 M | $172.3 M | $108.55 M | $8.88 M (8.91%) |
| 2022-11-29 | $305.0 M | $158.2 M | $99.67 M | $8.45 M (9.26%) |
| 2022-11-25 | $284.0 M | $144.8 M | $91.22 M | $8.44 M (10.19%) |
| 2022-11-22 | $259.0 M | $131.4 M | $82.78 M | $7.75 M (10.32%) |
| 2022-11-18 | $238.0 M | $119.1 M | $75.03 M | $10.27 M (15.85%) |
| 2022-11-15 | $207.0 M | $102.8 M | $64.76 M | $7.43 M (12.96%) |
| 2022-11-11 | $189.0 M | $91.0 M | $57.33 M | $10.27 M (21.82%) |
| 2022-11-08 | $154.0 M | $74.7 M | $47.06 M | $9.83 M (26.39%) |
| 2022-11-04 | $119.0 M | $59.1 M | $37.23 M | $10.27 M (38.07%) |
| 2022-11-01 | $87.0 M | $42.8 M | $26.96 M | $7.43 M (38.04%) |
| 2022-10-28 | $64.0 M | $31.0 M | $19.53 M | $6.05 M (44.86%) |
| 2022-10-25 | $45.0 M | $21.4 M | $13.48 M | $4.09 M (43.6%) |
| 2022-10-21 | $30.0 M | $14.9 M | $9.39 M | $3.09 M (49.05%) |
| 2022-10-18 | $20.0 M | $10.0 M | $6.3 M | - |
| 2022-10-14 | $494.0 M | $248.7 M | $156.68 M | $14.3 M (10.04%) |
| 2022-10-11 | $445.0 M | $226.0 M | $142.38 M | $7.69 M (5.71%) |
| 2022-10-07 | $410.0 M | $213.8 M | $134.69 M | $9.7 M (7.76%) |
| 2022-10-04 | $380.0 M | $198.4 M | $124.99 M | $9.32 M (8.06%) |
| 2022-09-30 | $355.0 M | $183.6 M | $115.67 M | $7.06 M (6.5%) |
| 2022-09-27 | $325.0 M | $172.4 M | $108.61 M | $7.62 M (7.55%) |
| 2022-09-23 | $301.0 M | $160.3 M | $100.99 M | $7.12 M (7.58%) |
| 2022-09-20 | $277.0 M | $149.0 M | $93.87 M | $7.31 M (8.44%) |
| 2022-09-16 | $256.0 M | $137.4 M | $86.56 M | $7.31 M (9.22%) |
| 2022-09-13 | $231.0 M | $125.8 M | $79.25 M | $7.43 M (10.35%) |
| 2022-09-09 | $210.0 M | $114.0 M | $71.82 M | $5.48 M (8.26%) |
| 2022-09-06 | $191.0 M | $105.3 M | $66.34 M | $6.24 M (10.38%) |
| 2022-09-02 | $169.0 M | $95.4 M | $60.1 M | $5.98 M (11.06%) |
| 2022-08-30 | $153.0 M | $85.9 M | $54.12 M | $6.37 M (13.33%) |
| 2022-08-26 | $135.0 M | $75.8 M | $47.75 M | $6.42 M (15.54%) |
| 2022-08-23 | $116.0 M | $65.6 M | $41.33 M | $5.74 M (16.11%) |
| 2022-08-19 | $99.0 M | $56.5 M | $35.6 M | $5.93 M (19.97%) |
| 2022-08-16 | $82.0 M | $47.1 M | $29.67 M | $5.79 M (24.26%) |
| 2022-08-12 | $65.0 M | $37.9 M | $23.88 M | $4.85 M (25.51%) |
| 2022-08-09 | $52.0 M | $30.2 M | $19.03 M | $5.55 M (41.15%) |
| 2022-08-05 | $36.0 M | $21.4 M | $13.48 M | $6.17 M (84.46%) |
| 2022-08-02 | $20.0 M | $11.6 M | $7.31 M | - |
| 2022-07-29 | $1280.0 M | $747.2 M | $470.74 M | $163.36 M (53.15%) |
| 2022-07-26 | $830.0 M | $487.9 M | $307.38 M | $62.94 M (25.75%) |
| 2022-07-22 | $660.0 M | $388.0 M | $244.44 M | $44.79 M (22.44%) |
| 2022-07-19 | $555.0 M | $316.9 M | $199.65 M | $25.77 M (14.82%) |
| 2022-07-15 | $480.0 M | $276.0 M | $173.88 M | $17.77 M (11.38%) |
| 2022-07-12 | $440.0 M | $247.8 M | $156.11 M | $10.64 M (7.32%) |
| 2022-07-08 | $410.0 M | $230.9 M | $145.47 M | $11.09 M (8.25%) |
| 2022-07-05 | $370.0 M | $213.3 M | $134.38 M | $8.82 M (7.03%) |
| 2022-07-01 | $360.0 M | $199.3 M | $125.56 M | $8.63 M (7.38%) |
| 2022-06-28 | $333.0 M | $185.6 M | $116.93 M | $7.56 M (6.91%) |
| 2022-06-24 | $312.0 M | $173.6 M | $109.37 M | $7.12 M (6.96%) |
| 2022-06-21 | $290.0 M | $162.3 M | $102.25 M | $6.68 M (6.99%) |
| 2022-06-17 | $273.0 M | $151.7 M | $95.57 M | $6.99 M (7.89%) |
| 2022-06-14 | $247.0 M | $140.6 M | $88.58 M | $6.81 M (8.32%) |
| 2022-06-10 | $226.0 M | $129.8 M | $81.77 M | $6.61 M (8.8%) |
| 2022-06-07 | $207.0 M | $119.3 M | $75.16 M | $5.92 M (8.55%) |
| 2022-06-03 | $189.0 M | $109.9 M | $69.24 M | $5.74 M (9.03%) |
| 2022-05-31 | $170.0 M | $100.8 M | $63.5 M | $5.23 M (8.97%) |
| 2022-05-27 | $157.0 M | $92.5 M | $58.28 M | $5.61 M (10.66%) |
| 2022-05-24 | $143.0 M | $83.6 M | $52.67 M | $5.48 M (11.62%) |
| 2022-05-20 | $131.0 M | $74.9 M | $47.19 M | $6.3 M (15.42%) |
| 2022-05-17 | $112.0 M | $64.9 M | $40.89 M | $4.98 M (13.87%) |
| 2022-05-13 | $99.0 M | $57.0 M | $35.91 M | $4.98 M (16.09%) |
| 2022-05-10 | $86.0 M | $49.1 M | $30.93 M | $4.91 M (18.87%) |
| 2022-05-06 | $70.0 M | $41.3 M | $26.02 M | $4.66 M (21.83%) |
| 2022-05-03 | $57.0 M | $33.9 M | $21.36 M | $5.04 M (30.91%) |
| 2022-04-29 | $43.0 M | $25.9 M | $16.32 M | $4.73 M (40.79%) |
| 2022-04-26 | $31.0 M | $18.4 M | $11.59 M | $3.46 M (42.61%) |
| 2022-04-22 | $22.0 M | $12.9 M | $8.13 M | $0.63 M (8.44%) |
| 2022-04-19 | $20.0 M | $11.9 M | $7.5 M | $-0.12 M (-1.61%) |
| 2022-04-15 | $20.0 M | $12.1 M | $7.62 M | - |
| 2022-04-12 | $106.0 M | $65.3 M | $41.14 M | $3.53 M (9.38%) |
| 2022-04-08 | $94.0 M | $59.7 M | $37.61 M | $5.17 M (15.92%) |
| 2022-04-05 | $81.0 M | $51.5 M | $32.45 M | $4.29 M (15.23%) |
| 2022-04-01 | $70.0 M | $44.7 M | $28.16 M | $4.28 M (17.94%) |
| 2022-03-29 | $60.0 M | $37.9 M | $23.88 M | $3.91 M (19.57%) |
| 2022-03-25 | $50.0 M | $31.7 M | $19.97 M | $4.03 M (25.29%) |
| 2022-03-22 | $39.0 M | $25.3 M | $15.94 M | $4.03 M (33.87%) |
| 2022-03-18 | $29.0 M | $18.9 M | $11.91 M | $2.78 M (30.38%) |
| 2022-03-15 | $22.0 M | $14.5 M | $9.14 M | $0.7 M (8.27%) |
| 2022-03-11 | $20.0 M | $13.4 M | $8.44 M | - |
| 2022-03-08 | $126.0 M | $86.1 M | $54.24 M | $5.73 M (11.81%) |
| 2022-03-04 | $113.0 M | $77.0 M | $48.51 M | $5.86 M (13.74%) |
| 2022-03-01 | $102.0 M | $67.7 M | $42.65 M | $5.98 M (16.32%) |
| 2022-02-25 | $87.0 M | $58.2 M | $36.67 M | $5.11 M (16.18%) |
| 2022-02-22 | $75.0 M | $50.1 M | $31.56 M | $4.97 M (18.71%) |
| 2022-02-18 | $64.0 M | $42.2 M | $26.59 M | $4.48 M (20.25%) |
| 2022-02-15 | $53.0 M | $35.1 M | $22.11 M | $4.41 M (24.89%) |
| 2022-02-11 | $42.0 M | $28.1 M | $17.7 M | $4.47 M (33.79%) |
| 2022-02-08 | $31.0 M | $21.0 M | $13.23 M | $3.78 M (40.0%) |
| 2022-02-04 | $22.0 M | $15.0 M | $9.45 M | $0.82 M (9.49%) |
| 2022-02-01 | $20.0 M | $13.7 M | $8.63 M | - |
| 2022-01-28 | $421.0 M | $290.9 M | $183.27 M | $10.9 M (6.32%) |
| 2022-01-25 | $396.0 M | $273.6 M | $172.37 M | $10.84 M (6.71%) |
| 2022-01-21 | $376.0 M | $256.4 M | $161.53 M | $10.71 M (7.1%) |
| 2022-01-18 | $347.0 M | $239.4 M | $150.82 M | $9.64 M (6.83%) |
| 2022-01-14 | $325.0 M | $224.1 M | $141.18 M | $10.96 M (8.42%) |
| 2022-01-11 | $300.0 M | $206.7 M | $130.22 M | $8.63 M (7.1%) |
| 2022-01-07 | $278.0 M | $193.0 M | $121.59 M | $10.96 M (9.91%) |
| 2022-01-04 | $253.0 M | $175.6 M | $110.63 M | $10.08 M (10.03%) |
| 2021-12-31 | $221.0 M | $159.6 M | $100.55 M | $9.77 M (10.76%) |
| 2021-12-28 | $201.0 M | $144.1 M | $90.78 M | $6.17 M (7.29%) |
| 2021-12-24 | $187.0 M | $134.3 M | $84.61 M | $6.11 M (7.79%) |
| 2021-12-21 | $171.0 M | $124.6 M | $78.5 M | $5.61 M (7.7%) |
| 2021-12-17 | $160.0 M | $115.7 M | $72.89 M | $5.42 M (8.03%) |
| 2021-12-14 | $148.0 M | $107.1 M | $67.47 M | $5.42 M (8.73%) |
| 2021-12-10 | $135.0 M | $98.5 M | $62.06 M | $5.86 M (10.43%) |
| 2021-12-07 | $122.0 M | $89.2 M | $56.2 M | $4.86 M (9.46%) |
| 2021-12-03 | $112.0 M | $81.5 M | $51.35 M | $5.17 M (11.2%) |
| 2021-11-30 | $102.0 M | $73.3 M | $46.18 M | $4.41 M (10.56%) |
| 2021-11-26 | $94.0 M | $66.3 M | $41.77 M | $4.41 M (11.81%) |
| 2021-11-23 | $83.0 M | $59.3 M | $37.36 M | $4.41 M (13.39%) |
| 2021-11-19 | $74.0 M | $52.3 M | $32.95 M | $4.6 M (16.23%) |
| 2021-11-16 | $63.0 M | $45.0 M | $28.35 M | $4.1 M (16.88%) |
| 2021-11-12 | $53.0 M | $38.5 M | $24.26 M | $3.97 M (19.59%) |
| 2021-11-09 | $45.0 M | $32.2 M | $20.29 M | $4.23 M (26.3%) |
| 2021-11-05 | $36.0 M | $25.5 M | $16.07 M | $4.48 M (38.63%) |
| 2021-11-02 | $26.0 M | $18.4 M | $11.59 M | $1.89 M (19.46%) |
| 2021-10-29 | $22.0 M | $15.4 M | $9.7 M | $0.94 M (10.77%) |
| 2021-10-26 | $20.0 M | $13.9 M | $8.76 M | - |
| 2021-10-22 | $108.0 M | $75.7 M | $47.69 M | $6.11 M (14.69%) |
| 2021-10-19 | $94.0 M | $66.0 M | $41.58 M | $4.79 M (13.01%) |
| 2021-10-15 | $84.0 M | $58.4 M | $36.79 M | $5.04 M (15.87%) |
| 2021-10-12 | $73.0 M | $50.4 M | $31.75 M | $5.23 M (19.71%) |
| 2021-10-08 | $60.0 M | $42.1 M | $26.52 M | $6.55 M (32.79%) |
| 2021-10-05 | $45.0 M | $31.7 M | $19.97 M | $5.04 M (33.75%) |
| 2021-10-01 | $34.0 M | $23.7 M | $14.93 M | $4.98 M (49.99%) |
| 2021-09-28 | $22.0 M | $15.8 M | $9.95 M | $0.82 M (8.92%) |
| 2021-09-24 | $20.0 M | $14.5 M | $9.14 M | - |
| 2021-09-21 | $432.0 M | $312.8 M | $197.06 M | $11.4 M (6.14%) |
| 2021-09-17 | $405.0 M | $294.7 M | $185.66 M | $10.96 M (6.27%) |
| 2021-09-14 | $383.0 M | $277.3 M | $174.7 M | $8.57 M (5.16%) |
| 2021-09-10 | $368.0 M | $263.7 M | $166.13 M | $9.45 M (6.03%) |
| 2021-09-07 | $345.0 M | $248.7 M | $156.68 M | $8.69 M (5.87%) |
| 2021-09-03 | $323.0 M | $234.9 M | $147.99 M | $8.76 M (6.29%) |
| 2021-08-31 | $306.0 M | $221.0 M | $139.23 M | $7.62 M (5.79%) |
| 2021-08-27 | $288.0 M | $208.9 M | $131.61 M | $7.69 M (6.2%) |
| 2021-08-24 | $270.0 M | $196.7 M | $123.92 M | $6.99 M (5.98%) |
| 2021-08-20 | $256.0 M | $185.6 M | $116.93 M | $7.81 M (7.16%) |
| 2021-08-17 | $242.0 M | $173.2 M | $109.12 M | $7.56 M (7.45%) |
| 2021-08-13 | $225.0 M | $161.2 M | $101.56 M | $6.93 M (7.33%) |
| 2021-08-10 | $208.0 M | $150.2 M | $94.63 M | $6.56 M (7.44%) |
| 2021-08-06 | $191.0 M | $139.8 M | $88.07 M | $6.8 M (8.37%) |
| 2021-08-03 | $179.0 M | $129.0 M | $81.27 M | $5.67 M (7.5%) |
| 2021-07-30 | $166.0 M | $120.0 M | $75.6 M | $6.3 M (9.09%) |
| 2021-07-27 | $153.0 M | $110.0 M | $69.3 M | $6.3 M (10.0%) |
| 2021-07-23 | $140.0 M | $100.0 M | $63.0 M | $5.67 M (9.89%) |
| 2021-07-20 | $128.0 M | $91.0 M | $57.33 M | $5.04 M (9.64%) |
| 2021-07-16 | $117.0 M | $83.0 M | $52.29 M | $5.67 M (12.16%) |
| 2021-07-13 | $104.0 M | $74.0 M | $46.62 M | $5.04 M (12.12%) |
| 2021-07-09 | $94.0 M | $66.0 M | $41.58 M | $5.67 M (15.79%) |
| 2021-07-06 | $82.0 M | $57.0 M | $35.91 M | $4.41 M (14.0%) |
| 2021-07-02 | $72.0 M | $50.0 M | $31.5 M | $5.04 M (19.05%) |
| 2021-06-29 | $61.0 M | $42.0 M | $26.46 M | $5.04 M (23.53%) |
| 2021-06-25 | $50.0 M | $34.0 M | $21.42 M | $3.78 M (21.43%) |
| 2021-06-22 | $40.0 M | $28.0 M | $17.64 M | $5.04 M (40.0%) |
| 2021-06-18 | $30.0 M | $20.0 M | $12.6 M | $3.15 M (33.33%) |
| 2021-06-15 | $22.0 M | $15.0 M | $9.45 M | $1.26 M (15.38%) |
| 2021-06-11 | $20.0 M | $13.0 M | $8.19 M | - |
| 2021-06-08 | $56.0 M | $38.0 M | $23.94 M | $5.04 M (26.67%) |
| 2021-06-04 | $45.0 M | $30.0 M | $18.9 M | $4.41 M (30.43%) |
| 2021-06-01 | $34.0 M | $23.0 M | $14.49 M | $5.04 M (53.33%) |
| 2021-05-28 | $22.0 M | $15.0 M | $9.45 M | $1.26 M (15.38%) |
| 2021-05-25 | $20.0 M | $13.0 M | $8.19 M | - |
| 2021-05-21 | $515.0 M | $346.0 M | $217.98 M | $17.01 M (8.46%) |
| 2021-05-18 | $475.0 M | $319.0 M | $200.97 M | $17.64 M (9.62%) |
| 2021-05-14 | $430.0 M | $291.0 M | $183.33 M | $11.97 M (6.99%) |
| 2021-05-11 | $402.0 M | $272.0 M | $171.36 M | $11.34 M (7.09%) |
| 2021-05-07 | $370.0 M | $254.0 M | $160.02 M | $12.6 M (8.55%) |
| 2021-05-04 | $345.0 M | $234.0 M | $147.42 M | $10.08 M (7.34%) |
| 2021-04-30 | $319.0 M | $218.0 M | $137.34 M | $8.82 M (6.86%) |
| 2021-04-27 | $297.0 M | $204.0 M | $128.52 M | $9.45 M (7.94%) |
| 2021-04-23 | $277.0 M | $189.0 M | $119.07 M | $8.82 M (8.0%) |
| 2021-04-20 | $257.0 M | $175.0 M | $110.25 M | $8.19 M (8.02%) |
| 2021-04-16 | $240.0 M | $162.0 M | $102.06 M | $8.82 M (9.46%) |
| 2021-04-13 | $220.0 M | $148.0 M | $93.24 M | $8.19 M (9.63%) |
| 2021-04-09 | $201.0 M | $135.0 M | $85.05 M | $7.56 M (9.76%) |
| 2021-04-06 | $184.0 M | $123.0 M | $77.49 M | $6.93 M (9.82%) |
| 2021-04-02 | $168.0 M | $112.0 M | $70.56 M | $6.3 M (9.8%) |
| 2021-03-30 | $152.0 M | $102.0 M | $64.26 M | $6.3 M (10.87%) |
| 2021-03-26 | $137.0 M | $92.0 M | $57.96 M | $6.93 M (13.58%) |
| 2021-03-23 | $122.0 M | $81.0 M | $51.03 M | $6.3 M (14.08%) |
| 2021-03-19 | $105.0 M | $71.0 M | $44.73 M | $5.67 M (14.52%) |
| 2021-03-16 | $93.0 M | $62.0 M | $39.06 M | $5.04 M (14.81%) |
| 2021-03-12 | $79.0 M | $54.0 M | $34.02 M | $5.04 M (17.39%) |
| 2021-03-09 | $68.0 M | $46.0 M | $28.98 M | $5.04 M (21.05%) |
| 2021-03-05 | $55.0 M | $38.0 M | $23.94 M | $5.67 M (31.03%) |
| 2021-03-02 | $43.0 M | $29.0 M | $18.27 M | $5.04 M (38.1%) |
| 2021-02-26 | $30.0 M | $21.0 M | $13.23 M | $3.78 M (40.0%) |
| 2021-02-23 | $22.0 M | $15.0 M | $9.45 M | $0.63 M (7.14%) |
| 2021-02-19 | $20.0 M | $14.0 M | $8.82 M | - |
| 2021-02-16 | $96.0 M | $69.0 M | $43.47 M | $6.3 M (16.95%) |
| 2021-02-12 | $82.0 M | $59.0 M | $37.17 M | $6.3 M (20.41%) |
| 2021-02-09 | $68.0 M | $49.0 M | $30.87 M | $6.3 M (25.64%) |
| 2021-02-05 | $54.0 M | $39.0 M | $24.57 M | $5.04 M (25.81%) |
| 2021-02-02 | $42.0 M | $31.0 M | $19.53 M | $8.19 M (72.22%) |
| 2021-01-29 | $25.0 M | $18.0 M | $11.34 M | $2.52 M (28.57%) |
| 2021-01-26 | $20.0 M | $14.0 M | $8.82 M | $-456.75 M (-98.11%) |
| 2021-01-22 | $1.0 M | $739.0 M | $465.57 M | - |
| 2021-01-19 | $865.0 M | $638.0 M | $401.94 M | $55.44 M (16.0%) |
| 2021-01-15 | $750.0 M | $550.0 M | $346.5 M | $62.37 M (21.95%) |
| 2021-01-12 | $625.0 M | $451.0 M | $284.13 M | $42.84 M (17.75%) |
| 2021-01-08 | $520.0 M | $383.0 M | $241.29 M | $27.72 M (12.98%) |
| 2021-01-05 | $447.0 M | $339.0 M | $213.57 M | $21.42 M (11.15%) |
| 2021-01-01 | $401.0 M | $305.0 M | $192.15 M | $11.34 M (6.27%) |
| 2020-12-29 | $376.0 M | $287.0 M | $180.81 M | $11.34 M (6.69%) |
| 2020-12-25 | $352.0 M | $269.0 M | $169.47 M | $10.71 M (6.75%) |
| 2020-12-22 | $330.0 M | $252.0 M | $158.76 M | $8.82 M (5.88%) |
| 2020-12-18 | $310.0 M | $238.0 M | $149.94 M | $8.82 M (6.25%) |
| 2020-12-15 | $291.0 M | $224.0 M | $141.12 M | $8.19 M (6.16%) |
| 2020-12-11 | $276.0 M | $211.0 M | $132.93 M | $7.56 M (6.03%) |
| 2020-12-08 | $264.0 M | $199.0 M | $125.37 M | $7.56 M (6.42%) |
| 2020-12-04 | $244.0 M | $187.0 M | $117.81 M | $6.3 M (5.65%) |
| 2020-12-01 | $229.0 M | $177.0 M | $111.51 M | $7.56 M (7.27%) |
| 2020-11-27 | $214.0 M | $165.0 M | $103.95 M | $6.3 M (6.45%) |
| 2020-11-24 | $200.0 M | $155.0 M | $97.65 M | $6.3 M (6.9%) |
| 2020-11-20 | $188.0 M | $145.0 M | $91.35 M | $6.3 M (7.41%) |
| 2020-11-17 | $176.0 M | $135.0 M | $85.05 M | $6.93 M (8.87%) |
| 2020-11-13 | $165.0 M | $124.0 M | $78.12 M | $4.41 M (5.98%) |
| 2020-11-10 | $152.0 M | $117.0 M | $73.71 M | $5.67 M (8.33%) |
| 2020-11-06 | $142.0 M | $108.0 M | $68.04 M | $5.67 M (9.09%) |
| 2020-11-03 | $129.0 M | $99.0 M | $62.37 M | $5.04 M (8.79%) |
| 2020-10-30 | $118.0 M | $91.0 M | $57.33 M | $5.04 M (9.64%) |
| 2020-10-27 | $109.0 M | $83.0 M | $52.29 M | $5.04 M (10.67%) |
| 2020-10-23 | $97.0 M | $75.0 M | $47.25 M | $5.04 M (11.94%) |
| 2020-10-20 | $86.0 M | $67.0 M | $42.21 M | $4.41 M (11.67%) |
| 2020-10-16 | $77.0 M | $60.0 M | $37.8 M | $4.41 M (13.21%) |
| 2020-10-13 | $69.0 M | $53.0 M | $33.39 M | $4.41 M (15.22%) |
| 2020-10-09 | $60.0 M | $46.0 M | $28.98 M | $4.41 M (17.95%) |
| 2020-10-06 | $50.0 M | $39.0 M | $24.57 M | $4.41 M (21.88%) |
| 2020-10-02 | $41.0 M | $32.0 M | $20.16 M | $4.41 M (28.0%) |
| 2020-09-29 | $32.0 M | $25.0 M | $15.75 M | $3.78 M (31.58%) |
| 2020-09-25 | $24.0 M | $19.0 M | $11.97 M | $1.26 M (11.76%) |
| 2020-09-22 | $22.0 M | $17.0 M | $10.71 M | $1.26 M (13.33%) |
| 2020-09-18 | $20.0 M | $15.0 M | $9.45 M | - |
| 2020-09-15 | $119.0 M | $94.0 M | $59.22 M | $5.04 M (9.3%) |
| 2020-09-11 | $108.0 M | $86.0 M | $54.18 M | $5.67 M (11.69%) |
| 2020-09-08 | $97.0 M | $77.0 M | $48.51 M | $5.04 M (11.59%) |
| 2020-09-04 | $88.0 M | $69.0 M | $43.47 M | $5.04 M (13.11%) |
| 2020-09-01 | $78.0 M | $61.0 M | $38.43 M | $5.04 M (15.09%) |
| 2020-08-28 | $68.0 M | $53.0 M | $33.39 M | $5.04 M (17.78%) |
| 2020-08-25 | $57.0 M | $45.0 M | $28.35 M | $4.41 M (18.42%) |
| 2020-08-21 | $49.0 M | $38.0 M | $23.94 M | $4.41 M (22.58%) |
| 2020-08-18 | $40.0 M | $31.0 M | $19.53 M | $4.41 M (29.17%) |
| 2020-08-14 | $31.0 M | $24.0 M | $15.12 M | $3.15 M (26.32%) |
| 2020-08-11 | $24.0 M | $19.0 M | $11.97 M | $0.63 M (5.56%) |
| 2020-08-07 | $22.0 M | $18.0 M | $11.34 M | $1.26 M (12.5%) |
| 2020-08-04 | $20.0 M | $16.0 M | $10.08 M | - |
| 2020-07-31 | $22.0 M | $17.0 M | $10.71 M | $0.63 M (6.25%) |
| 2020-07-28 | $20.0 M | $16.0 M | $10.08 M | - |
| 2020-07-24 | $124.0 M | $99.0 M | $62.37 M | $5.67 M (10.0%) |
| 2020-07-21 | $113.0 M | $90.0 M | $56.7 M | $5.67 M (11.11%) |
| 2020-07-17 | $101.0 M | $81.0 M | $51.03 M | $5.04 M (10.96%) |
| 2020-07-14 | $91.0 M | $73.0 M | $45.99 M | $5.04 M (12.31%) |
| 2020-07-10 | $83.0 M | $65.0 M | $40.95 M | $5.04 M (14.04%) |
| 2020-07-07 | $73.0 M | $57.0 M | $35.91 M | $5.04 M (16.33%) |
| 2020-07-03 | $62.0 M | $49.0 M | $30.87 M | $4.41 M (16.67%) |
| 2020-06-30 | $53.0 M | $42.0 M | $26.46 M | $5.04 M (23.53%) |
| 2020-06-26 | $44.0 M | $34.0 M | $21.42 M | $4.41 M (25.93%) |
| 2020-06-23 | $35.0 M | $27.0 M | $17.01 M | $4.41 M (35.0%) |
| 2020-06-19 | $26.0 M | $20.0 M | $12.6 M | $1.89 M (17.65%) |
| 2020-06-16 | $22.0 M | $17.0 M | $10.71 M | $1.26 M (13.33%) |
| 2020-06-12 | $20.0 M | $15.0 M | $9.45 M | - |
| 2020-06-09 | $410.0 M | $308.0 M | $194.04 M | $6.93 M (3.7%) |
| 2020-06-05 | $378.0 M | $297.0 M | $187.11 M | $10.71 M (6.07%) |
| 2020-06-02 | $356.0 M | $280.0 M | $176.4 M | $9.45 M (5.66%) |
| 2020-05-29 | $336.0 M | $265.0 M | $166.95 M | $10.08 M (6.43%) |
| 2020-05-26 | $313.0 M | $249.0 M | $156.87 M | $8.82 M (5.96%) |
| 2020-05-22 | $298.0 M | $235.0 M | $148.05 M | $8.82 M (6.33%) |
| 2020-05-19 | $274.0 M | $221.0 M | $139.23 M | $6.93 M (5.24%) |
| 2020-05-15 | $266.0 M | $210.0 M | $132.3 M | $8.19 M (6.6%) |
| 2020-05-12 | $248.0 M | $197.0 M | $124.11 M | $8.19 M (7.07%) |
| 2020-05-08 | $231.0 M | $184.0 M | $115.92 M | $6.93 M (6.36%) |
| 2020-05-05 | $215.0 M | $173.0 M | $108.99 M | $7.56 M (7.45%) |
| 2020-05-01 | $200.0 M | $161.0 M | $101.43 M | $6.3 M (6.62%) |
| 2020-04-28 | $186.0 M | $151.0 M | $95.13 M | $5.67 M (6.34%) |
| 2020-04-24 | $174.0 M | $142.0 M | $89.46 M | $5.67 M (6.77%) |
| 2020-04-21 | $164.0 M | $133.0 M | $83.79 M | $5.04 M (6.4%) |
| 2020-04-17 | $159.0 M | $125.0 M | $78.75 M | $6.3 M (8.7%) |
| 2020-04-14 | $145.0 M | $115.0 M | $72.45 M | $4.41 M (6.48%) |
| 2020-04-10 | $136.0 M | $108.0 M | $68.04 M | $3.15 M (4.85%) |
| 2020-04-07 | $127.0 M | $103.0 M | $64.89 M | $4.41 M (7.29%) |
| 2020-04-03 | $121.0 M | $96.0 M | $60.48 M | $3.78 M (6.67%) |
| 2020-03-31 | $113.0 M | $90.0 M | $56.7 M | $4.41 M (8.43%) |
| 2020-03-27 | $107.0 M | $83.0 M | $52.29 M | $4.41 M (9.21%) |
| 2020-03-24 | $101.0 M | $76.0 M | $47.88 M | $0.0 M (0.0%) |
| 2020-03-20 | $96.0 M | $76.0 M | $47.88 M | $4.41 M (10.14%) |
| 2020-03-17 | $90.0 M | $69.0 M | $43.47 M | $2.52 M (6.15%) |
| 2020-03-13 | $80.0 M | $65.0 M | $40.95 M | $3.15 M (8.33%) |
| 2020-03-10 | $75.0 M | $60.0 M | $37.8 M | $5.04 M (15.38%) |
| 2020-03-06 | $70.0 M | $52.0 M | $32.76 M | $2.52 M (8.33%) |
| 2020-03-03 | $65.0 M | $48.0 M | $30.24 M | $3.78 M (14.29%) |
| 2020-02-28 | $60.0 M | $42.0 M | $26.46 M | $1.89 M (7.69%) |
| 2020-02-25 | $55.0 M | $39.0 M | $24.57 M | $2.52 M (11.43%) |
| 2020-02-21 | $50.0 M | $35.0 M | $22.05 M | $2.52 M (12.9%) |
| 2020-02-18 | $45.0 M | $31.0 M | $19.53 M | $1.89 M (10.71%) |
| 2020-02-14 | $40.0 M | $28.0 M | $17.64 M | - |
| 2020-02-11 | $202.0 M | $142.0 M | $89.46 M | $7.56 M (9.23%) |
| 2020-02-07 | $187.0 M | $130.0 M | $81.9 M | $7.56 M (10.17%) |
| 2020-02-04 | $168.0 M | $118.0 M | $74.34 M | $6.3 M (9.26%) |
| 2020-01-31 | $155.0 M | $108.0 M | $68.04 M | $6.93 M (11.34%) |
| 2020-01-28 | $141.0 M | $97.0 M | $61.11 M | $5.67 M (10.23%) |
| 2020-01-24 | $130.0 M | $88.0 M | $55.44 M | $6.3 M (12.82%) |
| 2020-01-21 | $116.0 M | $78.0 M | $49.14 M | $5.67 M (13.04%) |
| 2020-01-17 | $103.0 M | $69.0 M | $43.47 M | $5.04 M (13.11%) |
| 2020-01-14 | $91.0 M | $61.0 M | $38.43 M | $5.04 M (15.09%) |
| 2020-01-10 | $80.0 M | $53.0 M | $33.39 M | $4.41 M (15.22%) |
| 2020-01-07 | $69.0 M | $46.0 M | $28.98 M | $4.41 M (17.95%) |
| 2020-01-03 | $60.0 M | $39.0 M | $24.57 M | $1.26 M (5.41%) |
| 2019-12-31 | $55.0 M | $37.0 M | $23.31 M | $2.52 M (12.12%) |
| 2019-12-27 | $50.0 M | $33.0 M | $20.79 M | $1.89 M (10.0%) |
| 2019-12-24 | $45.0 M | $30.0 M | $18.9 M | $1.89 M (11.11%) |
| 2019-12-20 | $40.0 M | $27.0 M | $17.01 M | - |
| 2019-12-17 | $372.0 M | $251.0 M | $158.13 M | $13.23 M (9.13%) |
| 2019-12-13 | $340.0 M | $230.0 M | $144.9 M | $11.34 M (8.49%) |
| 2019-12-10 | $314.0 M | $212.0 M | $133.56 M | $10.71 M (8.72%) |
| 2019-12-06 | $285.0 M | $195.0 M | $122.85 M | $8.19 M (7.14%) |
| 2019-12-03 | $266.0 M | $182.0 M | $114.66 M | $9.45 M (8.98%) |
| 2019-11-29 | $243.0 M | $167.0 M | $105.21 M | $8.19 M (8.44%) |
| 2019-11-26 | $226.0 M | $154.0 M | $97.02 M | $8.19 M (9.22%) |
| 2019-11-22 | $208.0 M | $141.0 M | $88.83 M | $7.56 M (9.3%) |
| 2019-11-19 | $192.0 M | $129.0 M | $81.27 M | $7.56 M (10.26%) |
| 2019-11-15 | $178.0 M | $117.0 M | $73.71 M | $5.67 M (8.33%) |
| 2019-11-12 | $163.0 M | $108.0 M | $68.04 M | $6.93 M (11.34%) |
| 2019-11-08 | $145.0 M | $97.0 M | $61.11 M | $6.3 M (11.49%) |
| 2019-11-05 | $127.0 M | $87.0 M | $54.81 M | $5.04 M (10.13%) |
| 2019-11-01 | $118.0 M | $79.0 M | $49.77 M | $5.04 M (11.27%) |
| 2019-10-29 | $105.0 M | $71.0 M | $44.73 M | $5.04 M (12.7%) |
| 2019-10-25 | $93.0 M | $63.0 M | $39.69 M | $5.04 M (14.55%) |
| 2019-10-22 | $82.0 M | $55.0 M | $34.65 M | $4.41 M (14.58%) |
| 2019-10-18 | $71.0 M | $48.0 M | $30.24 M | $2.52 M (9.09%) |
| 2019-10-15 | $65.0 M | $44.0 M | $27.72 M | $1.26 M (4.76%) |
| 2019-10-11 | $60.0 M | $42.0 M | $26.46 M | $1.89 M (7.69%) |
| 2019-10-08 | $55.0 M | $39.0 M | $24.57 M | $2.52 M (11.43%) |
| 2019-10-04 | $50.0 M | $35.0 M | $22.05 M | $2.52 M (12.9%) |
| 2019-10-01 | $45.0 M | $31.0 M | $19.53 M | $2.52 M (14.81%) |
| 2019-09-27 | $40.0 M | $27.0 M | $17.01 M | - |
| 2019-09-24 | $227.0 M | $156.0 M | $98.28 M | $8.19 M (9.09%) |
| 2019-09-20 | $211.0 M | $143.0 M | $90.09 M | $8.19 M (10.0%) |
| 2019-09-17 | $192.0 M | $130.0 M | $81.9 M | $6.3 M (8.33%) |
| 2019-09-13 | $172.0 M | $120.0 M | $75.6 M | $6.93 M (10.09%) |
| 2019-09-10 | $154.0 M | $109.0 M | $68.67 M | $6.3 M (10.1%) |
| 2019-09-06 | $139.0 M | $99.0 M | $62.37 M | $5.67 M (10.0%) |
| 2019-09-03 | $127.0 M | $90.0 M | $56.7 M | $6.3 M (12.5%) |
| 2019-08-30 | $113.0 M | $80.0 M | $50.4 M | $5.04 M (11.11%) |
| 2019-08-27 | $103.0 M | $72.0 M | $45.36 M | $5.67 M (14.29%) |
| 2019-08-23 | $90.0 M | $63.0 M | $39.69 M | $4.41 M (12.5%) |
| 2019-08-20 | $79.0 M | $56.0 M | $35.28 M | $4.41 M (14.29%) |
| 2019-08-16 | $70.0 M | $49.0 M | $30.87 M | $3.15 M (11.36%) |
| 2019-08-13 | $65.0 M | $44.0 M | $27.72 M | $2.52 M (10.0%) |
| 2019-08-09 | $60.0 M | $40.0 M | $25.2 M | $2.52 M (11.11%) |
| 2019-08-06 | $55.0 M | $36.0 M | $22.68 M | $2.52 M (12.5%) |
| 2019-08-02 | $50.0 M | $32.0 M | $20.16 M | $1.89 M (10.34%) |
| 2019-07-30 | $45.0 M | $29.0 M | $18.27 M | $2.52 M (16.0%) |
| 2019-07-26 | $40.0 M | $25.0 M | $15.75 M | - |
| 2019-07-23 | $168.0 M | $108.0 M | $68.04 M | $6.3 M (10.2%) |
| 2019-07-19 | $154.0 M | $98.0 M | $61.74 M | $6.93 M (12.64%) |
| 2019-07-16 | $137.0 M | $87.0 M | $54.81 M | $5.67 M (11.54%) |
| 2019-07-12 | $121.0 M | $78.0 M | $49.14 M | $5.04 M (11.43%) |
| 2019-07-09 | $107.0 M | $70.0 M | $44.1 M | $5.67 M (14.75%) |
| 2019-07-05 | $95.0 M | $61.0 M | $38.43 M | $4.41 M (12.96%) |
| 2019-07-02 | $83.0 M | $54.0 M | $34.02 M | $5.04 M (17.39%) |
| 2019-06-28 | $71.0 M | $46.0 M | $28.98 M | $4.41 M (17.95%) |
| 2019-06-25 | $60.0 M | $39.0 M | $24.57 M | $1.89 M (8.33%) |
| 2019-06-21 | $55.0 M | $36.0 M | $22.68 M | $2.52 M (12.5%) |
| 2019-06-18 | $50.0 M | $32.0 M | $20.16 M | - |
| 2019-06-07 | $530.0 M | $343.0 M | $216.09 M | $22.68 M (11.73%) |
| 2019-06-04 | $475.0 M | $307.0 M | $193.41 M | $16.38 M (9.25%) |
| 2019-05-31 | $444.0 M | $281.0 M | $177.03 M | $11.34 M (6.84%) |
| 2019-05-28 | $418.0 M | $263.0 M | $165.69 M | $11.97 M (7.79%) |
| 2019-05-24 | $393.0 M | $244.0 M | $153.72 M | $10.08 M (7.02%) |
| 2019-05-21 | $367.0 M | $228.0 M | $143.64 M | $11.34 M (8.57%) |
| 2019-05-17 | $339.0 M | $210.0 M | $132.3 M | $9.45 M (7.69%) |
| 2019-05-14 | $315.0 M | $195.0 M | $122.85 M | $8.82 M (7.73%) |
| 2019-05-10 | $295.0 M | $181.0 M | $114.03 M | $8.82 M (8.38%) |
| 2019-05-07 | $273.0 M | $167.0 M | $105.21 M | $8.82 M (9.15%) |
| 2019-05-03 | $252.0 M | $153.0 M | $96.39 M | $8.19 M (9.29%) |
| 2019-04-30 | $229.0 M | $140.0 M | $88.2 M | $7.56 M (9.38%) |
| 2019-04-26 | $212.0 M | $128.0 M | $80.64 M | $7.56 M (10.34%) |
| 2019-04-23 | $192.0 M | $116.0 M | $73.08 M | $6.3 M (9.43%) |
| 2019-04-19 | $175.0 M | $106.0 M | $66.78 M | $6.93 M (11.58%) |
| 2019-04-16 | $157.0 M | $95.0 M | $59.85 M | $6.3 M (11.76%) |
| 2019-04-12 | $140.0 M | $85.0 M | $53.55 M | $7.56 M (16.44%) |
| 2019-04-09 | $120.0 M | $73.0 M | $45.99 M | $6.3 M (15.87%) |
| 2019-04-05 | $104.0 M | $63.0 M | $39.69 M | $5.67 M (16.67%) |
| 2019-04-02 | $88.0 M | $54.0 M | $34.02 M | $5.04 M (17.39%) |
| 2019-03-29 | $75.0 M | $46.0 M | $28.98 M | $6.93 M (31.43%) |
| 2019-03-26 | $57.0 M | $35.0 M | $22.05 M | $3.15 M (16.67%) |
| 2019-03-22 | $50.0 M | $30.0 M | $18.9 M | $1.89 M (11.11%) |
| 2019-03-19 | $45.0 M | $27.0 M | $17.01 M | $1.89 M (12.5%) |
| 2019-03-15 | $40.0 M | $24.0 M | $15.12 M | - |
| 2019-03-12 | $50.0 M | $30.0 M | $18.9 M | $2.52 M (15.38%) |
| 2019-03-08 | $45.0 M | $26.0 M | $16.38 M | $1.89 M (13.04%) |
| 2019-03-05 | $40.0 M | $23.0 M | $14.49 M | - |
| 2019-03-01 | $267.0 M | $161.0 M | $101.43 M | $8.19 M (8.78%) |
| 2019-02-26 | $245.0 M | $148.0 M | $93.24 M | $7.56 M (8.82%) |
| 2019-02-22 | $224.0 M | $136.0 M | $85.68 M | $7.56 M (9.68%) |
| 2019-02-19 | $206.0 M | $124.0 M | $78.12 M | $6.3 M (8.77%) |
| 2019-02-15 | $190.0 M | $114.0 M | $71.82 M | $5.67 M (8.57%) |
| 2019-02-12 | $173.0 M | $105.0 M | $66.15 M | $6.93 M (11.7%) |
| 2019-02-08 | $157.0 M | $94.0 M | $59.22 M | $6.3 M (11.9%) |
| 2019-02-05 | $139.0 M | $84.0 M | $52.92 M | $6.3 M (13.51%) |
| 2019-02-01 | $125.0 M | $74.0 M | $46.62 M | $5.67 M (13.85%) |
| 2019-01-29 | $109.0 M | $65.0 M | $40.95 M | $5.04 M (14.04%) |
| 2019-01-25 | $96.0 M | $57.0 M | $35.91 M | $5.67 M (18.75%) |
| 2019-01-22 | $82.0 M | $48.0 M | $30.24 M | $5.04 M (20.0%) |
| 2019-01-18 | $68.0 M | $40.0 M | $25.2 M | $4.41 M (21.21%) |
| 2019-01-15 | $55.0 M | $33.0 M | $20.79 M | $1.89 M (10.0%) |
| 2019-01-11 | $50.0 M | $30.0 M | $18.9 M | $1.89 M (11.11%) |
| 2019-01-08 | $45.0 M | $27.0 M | $17.01 M | $2.52 M (17.39%) |
| 2019-01-04 | $40.0 M | $23.0 M | $14.49 M | - |
| 2019-01-01 | $425.0 M | $254.0 M | $160.02 M | $19.53 M (13.9%) |
| 2018-12-28 | $370.0 M | $223.0 M | $140.49 M | $18.9 M (15.54%) |
| 2018-12-25 | $321.0 M | $193.0 M | $121.59 M | $16.38 M (15.57%) |
| 2018-12-18 | $284.0 M | $167.0 M | $105.21 M | $7.56 M (7.74%) |
| 2018-12-14 | $262.0 M | $155.0 M | $97.65 M | $6.93 M (7.64%) |
| 2018-12-11 | $245.0 M | $144.0 M | $90.72 M | $7.56 M (9.09%) |
| 2018-12-07 | $226.0 M | $132.0 M | $83.16 M | $8.19 M (10.92%) |
| 2018-12-04 | $208.0 M | $119.0 M | $74.97 M | $6.3 M (9.17%) |
| 2018-11-30 | $190.0 M | $109.0 M | $68.67 M | $6.3 M (10.1%) |
| 2018-11-27 | $172.0 M | $99.0 M | $62.37 M | $6.3 M (11.24%) |
| 2018-11-23 | $155.0 M | $89.0 M | $56.07 M | $6.3 M (12.66%) |
| 2018-11-20 | $139.0 M | $79.0 M | $49.77 M | $6.3 M (14.49%) |
| 2018-11-16 | $122.0 M | $69.0 M | $43.47 M | $6.3 M (16.95%) |
| 2018-11-13 | $106.0 M | $59.0 M | $37.17 M | $5.67 M (18.0%) |
| 2018-11-09 | $90.0 M | $50.0 M | $31.5 M | $6.93 M (28.21%) |
| 2018-11-06 | $70.0 M | $39.0 M | $24.57 M | $6.3 M (34.48%) |
| 2018-11-02 | $52.0 M | $29.0 M | $18.27 M | $2.52 M (16.0%) |
| 2018-10-30 | $45.0 M | $25.0 M | $15.75 M | $1.89 M (13.64%) |
| 2018-10-26 | $40.0 M | $22.0 M | $13.86 M | - |
| 2018-10-23 | $1600.0 M | $913.0 M | $575.19 M | $219.24 M (61.59%) |
| 2018-10-19 | $1000.0 M | $565.0 M | $355.95 M | $116.55 M (48.68%) |
| 2018-10-16 | $667.0 M | $380.0 M | $239.4 M | $5.04 M (2.15%) |
| 2018-10-12 | $654.0 M | $372.0 M | $234.36 M | $67.41 M (40.38%) |
| 2018-10-09 | $470.0 M | $265.0 M | $166.95 M | $17.64 M (11.81%) |
| 2018-10-05 | $420.0 M | $237.0 M | $149.31 M | $15.12 M (11.27%) |
| 2018-10-02 | $367.0 M | $213.0 M | $134.19 M | $11.34 M (9.23%) |
| 2018-09-28 | $336.0 M | $195.0 M | $122.85 M | $11.97 M (10.8%) |
| 2018-09-25 | $303.0 M | $176.0 M | $110.88 M | $9.45 M (9.32%) |
| 2018-09-21 | $275.0 M | $161.0 M | $101.43 M | $8.19 M (8.78%) |
| 2018-09-18 | $252.0 M | $148.0 M | $93.24 M | $8.82 M (10.45%) |
| 2018-09-14 | $227.0 M | $134.0 M | $84.42 M | $7.56 M (9.84%) |
| 2018-09-11 | $207.0 M | $122.0 M | $76.86 M | $6.93 M (9.91%) |
| 2018-09-07 | $187.0 M | $111.0 M | $69.93 M | $6.93 M (11.0%) |
| 2018-09-04 | $167.0 M | $100.0 M | $63.0 M | $5.67 M (9.89%) |
| 2018-08-31 | $152.0 M | $91.0 M | $57.33 M | $6.93 M (13.75%) |
| 2018-08-28 | $134.0 M | $80.0 M | $50.4 M | $6.3 M (14.29%) |
| 2018-08-24 | $118.0 M | $70.0 M | $44.1 M | $5.67 M (14.75%) |
| 2018-08-21 | $102.0 M | $61.0 M | $38.43 M | $5.67 M (17.31%) |
| 2018-08-17 | $88.0 M | $52.0 M | $32.76 M | $5.04 M (18.18%) |
| 2018-08-14 | $75.0 M | $44.0 M | $27.72 M | $4.41 M (18.92%) |
| 2018-08-10 | $63.0 M | $37.0 M | $23.31 M | $3.15 M (15.63%) |
| 2018-08-07 | $55.0 M | $32.0 M | $20.16 M | $1.89 M (10.34%) |
| 2018-08-03 | $50.0 M | $29.0 M | $18.27 M | $1.89 M (11.54%) |
| 2018-07-31 | $45.0 M | $26.0 M | $16.38 M | $1.89 M (13.04%) |
| 2018-07-27 | $40.0 M | $23.0 M | $14.49 M | - |
| 2018-07-24 | $522.0 M | $308.0 M | $194.04 M | $30.24 M (18.46%) |
| 2018-07-20 | $433.0 M | $260.0 M | $163.8 M | $21.42 M (15.04%) |
| 2018-07-17 | $375.0 M | $226.0 M | $142.38 M | $13.86 M (10.78%) |
| 2018-07-13 | $340.0 M | $204.0 M | $128.52 M | $11.97 M (10.27%) |
| 2018-07-10 | $306.0 M | $185.0 M | $116.55 M | $9.45 M (8.82%) |
| 2018-07-06 | $283.0 M | $170.0 M | $107.1 M | $10.08 M (10.39%) |
| 2018-07-03 | $256.0 M | $154.0 M | $97.02 M | $9.45 M (10.79%) |
| 2018-06-29 | $232.0 M | $139.0 M | $87.57 M | $8.19 M (10.32%) |
| 2018-06-26 | $212.0 M | $126.0 M | $79.38 M | $6.93 M (9.57%) |
| 2018-06-22 | $192.0 M | $115.0 M | $72.45 M | $6.3 M (9.52%) |
| 2018-06-19 | $175.0 M | $105.0 M | $66.15 M | $6.3 M (10.53%) |
| 2018-06-15 | $161.0 M | $95.0 M | $59.85 M | $6.3 M (11.76%) |
| 2018-06-12 | $144.0 M | $85.0 M | $53.55 M | $6.3 M (13.33%) |
| 2018-06-08 | $127.0 M | $75.0 M | $47.25 M | $6.3 M (15.38%) |
| 2018-06-05 | $110.0 M | $65.0 M | $40.95 M | $5.04 M (14.04%) |
| 2018-06-01 | $97.0 M | $57.0 M | $35.91 M | $5.04 M (16.33%) |
| 2018-05-29 | $84.0 M | $49.0 M | $30.87 M | $4.41 M (16.67%) |
| 2018-05-25 | $73.0 M | $42.0 M | $26.46 M | $5.04 M (23.53%) |
| 2018-05-22 | $60.0 M | $34.0 M | $21.42 M | $1.26 M (6.25%) |
| 2018-05-18 | $55.0 M | $32.0 M | $20.16 M | $1.89 M (10.34%) |
| 2018-05-15 | $50.0 M | $29.0 M | $18.27 M | $1.89 M (11.54%) |
| 2018-05-11 | $45.0 M | $26.0 M | $16.38 M | $1.89 M (13.04%) |
| 2018-05-08 | $40.0 M | $23.0 M | $14.49 M | - |
| 2018-05-04 | $143.0 M | $84.0 M | $52.92 M | $6.3 M (13.51%) |
| 2018-05-01 | $126.0 M | $74.0 M | $46.62 M | $5.67 M (13.85%) |
| 2018-04-27 | $111.0 M | $65.0 M | $40.95 M | $5.67 M (16.07%) |
| 2018-04-24 | $96.0 M | $56.0 M | $35.28 M | $5.67 M (19.15%) |
| 2018-04-20 | $80.0 M | $47.0 M | $29.61 M | $4.41 M (17.5%) |
| 2018-04-17 | $67.0 M | $40.0 M | $25.2 M | $4.41 M (21.21%) |
| 2018-04-13 | $55.0 M | $33.0 M | $20.79 M | $2.52 M (13.79%) |
| 2018-04-10 | $50.0 M | $29.0 M | $18.27 M | $1.26 M (7.41%) |
| 2018-04-06 | $45.0 M | $27.0 M | $17.01 M | $0.0 M (0.0%) |
| 2018-04-03 | $45.0 M | $27.0 M | $17.01 M | - |
| 2018-03-30 | $521.0 M | $317.0 M | $199.71 M | $27.09 M (15.69%) |
| 2018-03-27 | $458.0 M | $274.0 M | $172.62 M | $15.12 M (9.6%) |
| 2018-03-23 | $421.0 M | $250.0 M | $157.5 M | $15.75 M (11.11%) |
| 2018-03-20 | $377.0 M | $225.0 M | $141.75 M | $12.6 M (9.76%) |
| 2018-03-16 | $345.0 M | $205.0 M | $129.15 M | $11.34 M (9.63%) |
| 2018-03-13 | $318.0 M | $187.0 M | $117.81 M | $9.45 M (8.72%) |
| 2018-03-09 | $290.0 M | $172.0 M | $108.36 M | $9.45 M (9.55%) |
| 2018-03-06 | $265.0 M | $157.0 M | $98.91 M | $8.82 M (9.79%) |
| 2018-03-02 | $243.0 M | $143.0 M | $90.09 M | $8.19 M (10.0%) |
| 2018-02-27 | $222.0 M | $130.0 M | $81.9 M | $6.3 M (8.33%) |
| 2018-02-23 | $204.0 M | $120.0 M | $75.6 M | $6.93 M (10.09%) |
| 2018-02-20 | $185.0 M | $109.0 M | $68.67 M | $6.3 M (10.1%) |
| 2018-02-16 | $168.0 M | $99.0 M | $62.37 M | $5.67 M (10.0%) |
| 2018-02-13 | $153.0 M | $90.0 M | $56.7 M | $5.67 M (11.11%) |
| 2018-02-09 | $136.0 M | $81.0 M | $51.03 M | $6.3 M (14.08%) |
| 2018-02-06 | $120.0 M | $71.0 M | $44.73 M | $5.04 M (12.7%) |
| 2018-02-02 | $104.0 M | $63.0 M | $39.69 M | $5.67 M (16.67%) |
| 2018-01-30 | $89.0 M | $54.0 M | $34.02 M | $5.04 M (17.39%) |
| 2018-01-26 | $76.0 M | $46.0 M | $28.98 M | $5.04 M (21.05%) |
| 2018-01-23 | $63.0 M | $38.0 M | $23.94 M | $2.52 M (11.76%) |
| 2018-01-19 | $55.0 M | $34.0 M | $21.42 M | $2.52 M (13.33%) |
| 2018-01-16 | $50.0 M | $30.0 M | $18.9 M | $1.89 M (11.11%) |
| 2018-01-12 | $45.0 M | $27.0 M | $17.01 M | $1.26 M (8.0%) |
| 2018-01-09 | $40.0 M | $25.0 M | $15.75 M | - |
| 2018-01-05 | $450.0 M | $281.0 M | $177.03 M | $35.28 M (24.89%) |
| 2018-01-02 | $361.0 M | $225.0 M | $141.75 M | $20.16 M (16.58%) |
| 2017-12-29 | $306.0 M | $193.0 M | $121.59 M | $13.23 M (12.21%) |
| 2017-12-26 | $277.0 M | $172.0 M | $108.36 M | $9.45 M (9.55%) |
| 2017-12-22 | $253.0 M | $157.0 M | $98.91 M | $10.08 M (11.35%) |
| 2017-12-19 | $223.0 M | $141.0 M | $88.83 M | $6.93 M (8.46%) |
| 2017-12-15 | $208.0 M | $130.0 M | $81.9 M | $6.3 M (8.33%) |
| 2017-12-12 | $191.0 M | $120.0 M | $75.6 M | $6.3 M (9.09%) |
| 2017-12-08 | $176.0 M | $110.0 M | $69.3 M | $6.3 M (10.0%) |
| 2017-12-05 | $160.0 M | $100.0 M | $63.0 M | $5.67 M (9.89%) |
| 2017-12-01 | $145.0 M | $91.0 M | $57.33 M | $5.04 M (9.64%) |
| 2017-11-28 | $132.0 M | $83.0 M | $52.29 M | $5.04 M (10.67%) |
| 2017-11-24 | $119.0 M | $75.0 M | $47.25 M | $5.67 M (13.64%) |
| 2017-11-21 | $106.0 M | $66.0 M | $41.58 M | $4.41 M (11.86%) |
| 2017-11-17 | $95.0 M | $59.0 M | $37.17 M | $5.04 M (15.69%) |
| 2017-11-14 | $82.0 M | $51.0 M | $32.13 M | $4.41 M (15.91%) |
| 2017-11-10 | $71.0 M | $44.0 M | $27.72 M | $5.04 M (22.22%) |
| 2017-11-07 | $59.0 M | $36.0 M | $22.68 M | $4.41 M (24.14%) |
| 2017-11-03 | $48.0 M | $29.0 M | $18.27 M | $3.15 M (20.83%) |
| 2017-10-31 | $40.0 M | $24.0 M | $15.12 M | $3.78 M (33.33%) |
| 2017-10-27 | $30.0 M | $18.0 M | $11.34 M | $1.89 M (20.0%) |
| 2017-10-24 | $25.0 M | $15.0 M | $9.45 M | $1.89 M (25.0%) |
| 2017-10-20 | $20.0 M | $12.0 M | $7.56 M | $1.89 M (33.33%) |
| 2017-10-17 | $15.0 M | $9.0 M | $5.67 M | - |
| 2017-10-13 | $43.0 M | $26.0 M | $16.38 M | $2.52 M (18.18%) |
| 2017-10-10 | $36.0 M | $22.0 M | $13.86 M | $2.52 M (22.22%) |
| 2017-10-06 | $30.0 M | $18.0 M | $11.34 M | $1.89 M (20.0%) |
| 2017-10-03 | $25.0 M | $15.0 M | $9.45 M | $1.89 M (25.0%) |
| 2017-09-29 | $20.0 M | $12.0 M | $7.56 M | $1.89 M (33.33%) |
| 2017-09-26 | $15.0 M | $9.0 M | $5.67 M | - |
| 2017-09-22 | $104.0 M | $65.0 M | $40.95 M | $3.78 M (10.17%) |
| 2017-09-19 | $94.0 M | $59.0 M | $37.17 M | $3.15 M (9.26%) |
| 2017-09-15 | $86.0 M | $54.0 M | $34.02 M | $3.78 M (12.5%) |
| 2017-09-12 | $76.0 M | $48.0 M | $30.24 M | $2.52 M (9.09%) |
| 2017-09-08 | $70.0 M | $44.0 M | $27.72 M | $3.78 M (15.79%) |
| 2017-09-05 | $61.0 M | $38.0 M | $23.94 M | $3.15 M (15.15%) |
| 2017-09-01 | $53.0 M | $33.0 M | $20.79 M | $3.15 M (17.86%) |
| 2017-08-29 | $45.0 M | $28.0 M | $17.64 M | $3.15 M (21.74%) |
| 2017-08-25 | $37.0 M | $23.0 M | $14.49 M | $5.04 M (53.33%) |
| 2017-08-22 | $25.0 M | $15.0 M | $9.45 M | $1.89 M (25.0%) |
| 2017-08-18 | $20.0 M | $12.0 M | $7.56 M | $1.89 M (33.33%) |
| 2017-08-15 | $15.0 M | $9.0 M | $5.67 M | - |
| 2017-08-11 | $393.0 M | $246.0 M | $154.98 M | $17.64 M (12.84%) |
| 2017-08-08 | $350.0 M | $218.0 M | $137.34 M | $11.97 M (9.55%) |
| 2017-08-04 | $323.0 M | $199.0 M | $125.37 M | $8.19 M (6.99%) |
| 2017-08-01 | $303.0 M | $186.0 M | $117.18 M | $7.56 M (6.9%) |
| 2017-07-28 | $282.0 M | $174.0 M | $109.62 M | $6.3 M (6.1%) |
| 2017-07-25 | $262.0 M | $164.0 M | $103.32 M | $6.93 M (7.19%) |
| 2017-07-21 | $248.0 M | $153.0 M | $96.39 M | $6.3 M (6.99%) |
| 2017-07-18 | $232.0 M | $143.0 M | $90.09 M | $6.3 M (7.52%) |
| 2017-07-14 | $217.0 M | $133.0 M | $83.79 M | $6.3 M (8.13%) |
| 2017-07-11 | $202.0 M | $123.0 M | $77.49 M | $5.04 M (6.96%) |
| 2017-07-07 | $186.0 M | $115.0 M | $72.45 M | $5.67 M (8.49%) |
| 2017-07-04 | $172.0 M | $106.0 M | $66.78 M | $3.78 M (6.0%) |
| 2017-06-30 | $158.0 M | $100.0 M | $63.0 M | $5.04 M (8.7%) |
| 2017-06-27 | $145.0 M | $92.0 M | $57.96 M | $4.41 M (8.24%) |
| 2017-06-23 | $134.0 M | $85.0 M | $53.55 M | $5.04 M (10.39%) |
| 2017-06-20 | $123.0 M | $77.0 M | $48.51 M | $4.41 M (10.0%) |
| 2017-06-16 | $113.0 M | $70.0 M | $44.1 M | $4.41 M (11.11%) |
| 2017-06-13 | $101.0 M | $63.0 M | $39.69 M | $4.41 M (12.5%) |
| 2017-06-09 | $90.0 M | $56.0 M | $35.28 M | $3.78 M (12.0%) |
| 2017-06-06 | $80.0 M | $50.0 M | $31.5 M | $3.15 M (11.11%) |
| 2017-06-02 | $74.0 M | $45.0 M | $28.35 M | $3.15 M (12.5%) |
| 2017-05-30 | $65.0 M | $40.0 M | $25.2 M | $3.15 M (14.29%) |
| 2017-05-26 | $58.0 M | $35.0 M | $22.05 M | $3.15 M (16.67%) |
| 2017-05-23 | $50.0 M | $30.0 M | $18.9 M | $2.52 M (15.38%) |
| 2017-05-19 | $43.0 M | $26.0 M | $16.38 M | $3.15 M (23.81%) |
| 2017-05-16 | $36.0 M | $21.0 M | $13.23 M | $1.89 M (16.67%) |
| 2017-05-12 | $30.0 M | $18.0 M | $11.34 M | $1.89 M (20.0%) |
| 2017-05-09 | $25.0 M | $15.0 M | $9.45 M | $1.89 M (25.0%) |
| 2017-05-05 | $20.0 M | $12.0 M | $7.56 M | $1.89 M (33.33%) |
| 2017-05-02 | $15.0 M | $9.0 M | $5.67 M | - |
| 2017-04-28 | $61.0 M | $37.0 M | $23.31 M | $3.15 M (15.63%) |
| 2017-04-25 | $52.0 M | $32.0 M | $20.16 M | $3.15 M (18.52%) |
| 2017-04-21 | $45.0 M | $27.0 M | $17.01 M | $3.15 M (22.73%) |
| 2017-04-18 | $37.0 M | $22.0 M | $13.86 M | $2.52 M (22.22%) |
| 2017-04-14 | $30.0 M | $18.0 M | $11.34 M | $1.89 M (20.0%) |
| 2017-04-11 | $25.0 M | $15.0 M | $9.45 M | $1.89 M (25.0%) |
| 2017-04-07 | $20.0 M | $12.0 M | $7.56 M | $1.89 M (33.33%) |
| 2017-04-04 | $15.0 M | $9.0 M | $5.67 M | - |
| 2017-03-31 | $174.0 M | $106.0 M | $66.78 M | $5.04 M (8.16%) |
| 2017-03-28 | $162.0 M | $98.0 M | $61.74 M | $5.04 M (8.89%) |
| 2017-03-24 | $151.0 M | $90.0 M | $56.7 M | $4.41 M (8.43%) |
| 2017-03-21 | $140.0 M | $83.0 M | $52.29 M | $3.78 M (7.79%) |
| 2017-03-17 | $131.0 M | $77.0 M | $48.51 M | $4.41 M (10.0%) |
| 2017-03-14 | $119.0 M | $70.0 M | $44.1 M | $4.41 M (11.11%) |
| 2017-03-10 | $106.0 M | $63.0 M | $39.69 M | $4.41 M (12.5%) |
| 2017-03-07 | $94.0 M | $56.0 M | $35.28 M | $3.78 M (12.0%) |
| 2017-03-03 | $83.0 M | $50.0 M | $31.5 M | $3.78 M (13.64%) |
| 2017-02-28 | $73.0 M | $44.0 M | $27.72 M | $3.78 M (15.79%) |
| 2017-02-24 | $64.0 M | $38.0 M | $23.94 M | $3.15 M (15.15%) |
| 2017-02-21 | $55.0 M | $33.0 M | $20.79 M | $3.78 M (22.22%) |
| 2017-02-17 | $46.0 M | $27.0 M | $17.01 M | $3.15 M (22.73%) |
| 2017-02-14 | $38.0 M | $22.0 M | $13.86 M | $2.52 M (22.22%) |
| 2017-02-10 | $30.0 M | $18.0 M | $11.34 M | $1.89 M (20.0%) |
| 2017-02-07 | $25.0 M | $15.0 M | $9.45 M | $2.52 M (36.36%) |
| 2017-02-03 | $20.0 M | $11.0 M | $6.93 M | $1.89 M (37.5%) |
| 2017-01-31 | $15.0 M | $8.0 M | $5.04 M | - |
| 2017-01-27 | $188.0 M | $113.0 M | $71.19 M | $4.41 M (6.6%) |
| 2017-01-24 | $177.0 M | $106.0 M | $66.78 M | $5.04 M (8.16%) |
| 2017-01-20 | $162.0 M | $98.0 M | $61.74 M | $5.04 M (8.89%) |
| 2017-01-17 | $150.0 M | $90.0 M | $56.7 M | $4.41 M (8.43%) |
| 2017-01-13 | $137.0 M | $83.0 M | $52.29 M | $4.41 M (9.21%) |
| 2017-01-10 | $126.0 M | $76.0 M | $47.88 M | $4.41 M (10.14%) |
| 2017-01-06 | $117.0 M | $69.0 M | $43.47 M | $4.41 M (11.29%) |
| 2017-01-03 | $105.0 M | $62.0 M | $39.06 M | $3.15 M (8.77%) |
| 2016-12-30 | $96.0 M | $57.0 M | $35.91 M | $4.41 M (14.0%) |
| 2016-12-27 | $85.0 M | $50.0 M | $31.5 M | $3.15 M (11.11%) |
| 2016-12-23 | $76.0 M | $45.0 M | $28.35 M | $3.78 M (15.38%) |
| 2016-12-20 | $67.0 M | $39.0 M | $24.57 M | $2.52 M (11.43%) |
| 2016-12-16 | $59.0 M | $35.0 M | $22.05 M | $3.15 M (16.67%) |
| 2016-12-13 | $51.0 M | $30.0 M | $18.9 M | $3.15 M (20.0%) |
| 2016-12-09 | $43.0 M | $25.0 M | $15.75 M | $2.52 M (19.05%) |
| 2016-12-06 | $35.0 M | $21.0 M | $13.23 M | $1.89 M (16.67%) |
| 2016-12-02 | $30.0 M | $18.0 M | $11.34 M | $1.89 M (20.0%) |
| 2016-11-29 | $25.0 M | $15.0 M | $9.45 M | $1.89 M (25.0%) |
| 2016-11-25 | $20.0 M | $12.0 M | $7.56 M | $1.89 M (33.33%) |
| 2016-11-22 | $15.0 M | $9.0 M | $5.67 M | - |
| 2016-11-18 | $82.0 M | $50.0 M | $31.5 M | $3.15 M (11.11%) |
| 2016-11-15 | $73.0 M | $45.0 M | $28.35 M | $3.15 M (12.5%) |
| 2016-11-11 | $65.0 M | $40.0 M | $25.2 M | $3.15 M (14.29%) |
| 2016-11-08 | $54.0 M | $35.0 M | $22.05 M | $3.15 M (16.67%) |
| 2016-11-04 | $47.0 M | $30.0 M | $18.9 M | $2.52 M (15.38%) |
| 2016-11-01 | $40.0 M | $26.0 M | $16.38 M | $1.89 M (13.04%) |
| 2016-10-28 | $35.0 M | $23.0 M | $14.49 M | $2.52 M (21.05%) |
| 2016-10-25 | $30.0 M | $19.0 M | $11.97 M | $1.89 M (18.75%) |
| 2016-10-21 | $25.0 M | $16.0 M | $10.08 M | $1.89 M (23.08%) |
| 2016-10-18 | $20.0 M | $13.0 M | $8.19 M | $2.52 M (44.44%) |
| 2016-10-14 | $15.0 M | $9.0 M | $5.67 M | - |
| 2016-10-11 | $49.0 M | $32.0 M | $20.16 M | $3.15 M (18.52%) |
| 2016-10-07 | $41.0 M | $27.0 M | $17.01 M | $2.52 M (17.39%) |
| 2016-10-04 | $35.0 M | $23.0 M | $14.49 M | $1.89 M (15.0%) |
| 2016-09-30 | $30.0 M | $20.0 M | $12.6 M | $2.52 M (25.0%) |
| 2016-09-27 | $25.0 M | $16.0 M | $10.08 M | $1.89 M (23.08%) |
| 2016-09-23 | $20.0 M | $13.0 M | $8.19 M | $1.89 M (30.0%) |
| 2016-09-20 | $15.0 M | $10.0 M | $6.3 M | - |
| 2016-09-16 | $133.0 M | $89.0 M | $56.07 M | $4.41 M (8.54%) |
| 2016-09-13 | $122.0 M | $82.0 M | $51.66 M | $3.78 M (7.89%) |
| 2016-09-09 | $111.0 M | $76.0 M | $47.88 M | $4.41 M (10.14%) |
| 2016-09-06 | $101.0 M | $69.0 M | $43.47 M | $3.78 M (9.52%) |
| 2016-09-02 | $92.0 M | $63.0 M | $39.69 M | $3.15 M (8.62%) |
| 2016-08-30 | $84.0 M | $58.0 M | $36.54 M | $3.78 M (11.54%) |
| 2016-08-26 | $76.0 M | $52.0 M | $32.76 M | $3.15 M (10.64%) |
| 2016-08-23 | $69.0 M | $47.0 M | $29.61 M | $3.78 M (14.63%) |
| 2016-08-19 | $61.0 M | $41.0 M | $25.83 M | $3.15 M (13.89%) |
| 2016-08-16 | $52.0 M | $36.0 M | $22.68 M | $3.78 M (20.0%) |
| 2016-08-12 | $45.0 M | $30.0 M | $18.9 M | $2.52 M (15.38%) |
| 2016-08-09 | $38.0 M | $26.0 M | $16.38 M | $3.78 M (30.0%) |
| 2016-08-05 | $30.0 M | $20.0 M | $12.6 M | $1.89 M (17.65%) |
| 2016-08-02 | $25.0 M | $17.0 M | $10.71 M | $2.52 M (30.77%) |
| 2016-07-29 | $20.0 M | $13.0 M | $8.19 M | $1.89 M (30.0%) |
| 2016-07-26 | $15.0 M | $10.0 M | $6.3 M | $0.0 M (0.0%) |
| 2016-07-22 | $15.0 M | $10.0 M | $6.3 M | - |
| 2016-07-19 | $25.0 M | $17.0 M | $10.71 M | $2.52 M (30.77%) |
| 2016-07-15 | $20.0 M | $13.0 M | $8.19 M | $1.89 M (30.0%) |
| 2016-07-12 | $15.0 M | $10.0 M | $6.3 M | - |
| 2016-07-08 | $540.0 M | $380.0 M | $239.4 M | $38.43 M (19.12%) |
| 2016-07-05 | $454.0 M | $319.0 M | $200.97 M | $20.79 M (11.54%) |
| 2016-07-01 | $415.0 M | $286.0 M | $180.18 M | $13.23 M (7.92%) |
| 2016-06-28 | $390.0 M | $265.0 M | $166.95 M | $13.23 M (8.61%) |
| 2016-06-24 | $363.0 M | $244.0 M | $153.72 M | $11.34 M (7.96%) |
| 2016-06-21 | $333.0 M | $226.0 M | $142.38 M | $9.45 M (7.11%) |
| 2016-06-17 | $310.0 M | $211.0 M | $132.93 M | $8.19 M (6.57%) |
| 2016-06-14 | $293.0 M | $198.0 M | $124.74 M | $7.56 M (6.45%) |
| 2016-06-10 | $280.0 M | $186.0 M | $117.18 M | $8.19 M (7.51%) |
| 2016-06-07 | $260.0 M | $173.0 M | $108.99 M | $6.93 M (6.79%) |
| 2016-06-03 | $251.0 M | $162.0 M | $102.06 M | $5.67 M (5.88%) |
| 2016-05-31 | $235.0 M | $153.0 M | $96.39 M | $6.93 M (7.75%) |
| 2016-05-27 | $218.0 M | $142.0 M | $89.46 M | $6.3 M (7.58%) |
| 2016-05-24 | $203.0 M | $132.0 M | $83.16 M | $5.67 M (7.32%) |
| 2016-05-20 | $187.0 M | $123.0 M | $77.49 M | $5.67 M (7.89%) |
| 2016-05-17 | $174.0 M | $114.0 M | $71.82 M | $5.67 M (8.57%) |
| 2016-05-13 | $161.0 M | $105.0 M | $66.15 M | $4.41 M (7.14%) |
| 2016-05-10 | $150.0 M | $98.0 M | $61.74 M | $5.67 M (10.11%) |
| 2016-05-06 | $138.0 M | $89.0 M | $56.07 M | $4.41 M (8.54%) |
| 2016-05-03 | $128.0 M | $82.0 M | $51.66 M | $4.41 M (9.33%) |
| 2016-04-29 | $118.0 M | $75.0 M | $47.25 M | $3.78 M (8.7%) |
| 2016-04-26 | $108.0 M | $69.0 M | $43.47 M | $3.78 M (9.52%) |
| 2016-04-22 | $97.0 M | $63.0 M | $39.69 M | $3.15 M (8.62%) |
| 2016-04-19 | $89.0 M | $58.0 M | $36.54 M | $3.78 M (11.54%) |
| 2016-04-15 | $80.0 M | $52.0 M | $32.76 M | $3.15 M (10.64%) |
| 2016-04-12 | $72.0 M | $47.0 M | $29.61 M | $3.15 M (11.9%) |
| 2016-04-08 | $65.0 M | $42.0 M | $26.46 M | $3.15 M (13.51%) |
| 2016-04-05 | $57.0 M | $37.0 M | $23.31 M | $3.15 M (15.63%) |
| 2016-04-01 | $50.0 M | $32.0 M | $20.16 M | $3.15 M (18.52%) |
| 2016-03-29 | $43.0 M | $27.0 M | $17.01 M | $3.15 M (22.73%) |
| 2016-03-25 | $35.0 M | $22.0 M | $13.86 M | $1.89 M (15.79%) |
| 2016-03-22 | $30.0 M | $19.0 M | $11.97 M | $1.89 M (18.75%) |
| 2016-03-18 | $25.0 M | $16.0 M | $10.08 M | $2.52 M (33.33%) |
| 2016-03-15 | $20.0 M | $12.0 M | $7.56 M | $1.89 M (33.33%) |
| 2016-03-11 | $15.0 M | $9.0 M | $5.67 M | - |
| 2016-03-08 | $157.0 M | $101.0 M | $63.63 M | $4.41 M (7.45%) |
| 2016-03-04 | $144.0 M | $94.0 M | $59.22 M | $3.78 M (6.82%) |
| 2016-03-01 | $135.0 M | $88.0 M | $55.44 M | $4.41 M (8.64%) |
| 2016-02-26 | $125.0 M | $81.0 M | $51.03 M | $3.78 M (8.0%) |
| 2016-02-23 | $114.0 M | $75.0 M | $47.25 M | $4.41 M (10.29%) |
| 2016-02-19 | $104.0 M | $68.0 M | $42.84 M | $3.78 M (9.68%) |
| 2016-02-16 | $94.0 M | $62.0 M | $39.06 M | $3.15 M (8.77%) |
| 2016-02-12 | $87.0 M | $57.0 M | $35.91 M | $3.78 M (11.76%) |
| 2016-02-09 | $80.0 M | $51.0 M | $32.13 M | $3.78 M (13.33%) |
| 2016-02-05 | $71.0 M | $45.0 M | $28.35 M | $3.15 M (12.5%) |
| 2016-02-02 | $63.0 M | $40.0 M | $25.2 M | $3.15 M (14.29%) |
| 2016-01-29 | $56.0 M | $35.0 M | $22.05 M | - |